Stock Analysis · Basic Materials: Precious Metals Mining

Torex Gold Resources Inc. TXG

Institutional Equity Research: Torex Gold Resources Inc. (TSX: TXG / OTCQX: TORXF)

Research date 4 Oct 2026
36-month upside · live
+18%
Target $89.05 · price $75.19 · +75% when researched
Scorecard
81/100
Likelihood
78%
Tactical advice
BUY / ACCUMULATE
Price now
$75.19
36-mo target
$89.05
Sector
Basic Materials: Precious Metals Mining

Key Statistics

Core Statistical Dashboard & Key Data Points

MetricFigureContext & derivation
Founder-ledNo
SectorBasic Materials: Precious Metals Mining
Fair value$89.50 (+76%)
Insider ownership0.8%
Insider buying (last 6 months)No
Short squeeze potential18 / 100
Share buybackYes · 3.4% of float
Cash runwayOperationally Self-Sustaining
Gross margin44%
Regulatory Risk70 / 100Worsening Scrutiny over Mexican mining and water permits [28].
Geopolitical / SecurityRed flag80 / 100Stable Guerrero State regional security considerations [20].
Economic moat score68 / 100
Financial / Solvency1 / 10Improving Zero drawn debt; $506.3M total liquidity [4].
Valuation Multiple2 / 10Improving Trades at a 32% discount to peer median P/NAV [8].
Operational Execution4 / 10Improving Media Luna has passed initial ramp phase [6].
Competitive Risk2 / 10Stable High barrier to entry in regional skarn geology.
Customer Concentration3 / 10Stable Concentrate offtake placed across global traders/smelters [20].
Legal / Concession Title2 / 10Stable Concessions granted through 2038+; clean title history [27].
Key-Person Risk3 / 10Improving Transition to CEO Andrew Snowden executed smoothly [9].
Dilution Risk1 / 10Improving Active NCIB repurchasing shares in open market [2].
Market Tradability3 / 10Improving Planned U.S. listing expected to expand liquidity [7].
Institutional scorecard81 / 100
Tactical investment adviceBUY / ACCUMULATE

Not covered in this report: CEO score · Sector P/E · Rank among sector peers · Forward PEG (1–5 years) · Price floor · Share count now vs 36 months · Diluted vs fully diluted share count · Chance of a buyback in 6 months · Total debt vs cash · Debt maturities & severity · Primary competitive advantage · Rule of 40 (now to 4 years out) · Analyst coverage & price targets · Mine life · Offtake agreements & spot price

Investment Summary & Executive Scorecard

  • Stock Name: Torex Gold Resources Inc. (TSX: TXG / OTCQX: TORXF) [1]
  • Current Share Price: C50.87 (OTCQX USD equivalent, FX: 1.370 CAD/USD) [1]
  • Research Date: October 4, 2026
  • 12-Month Potential Stock Price: C64.60] (+27.0%)
  • 24-Month Potential Stock Price: C76.64] (+50.7%)
  • 36-Month Potential Stock Price: C89.05] (+75.1%)
  • Institutional Scorecard Score: 81 / 100
  • Likelihood Score of Executing the Base Case: 78 / 100
  • Investment Advice: BUY (High-Conviction Precious Metals Core Allocation)

Brief Explanation of Advice: Torex Gold has completed the construction and initial ramp-up of the Media Luna underground project at its Morelos Complex in Guerrero, Mexico, shifting from peak capital expenditure to harvest-mode cash generation [3]. With commercial production declared in mid-2025 and daily underground mining across Media Luna and El Limón Guajes (ELG) Underground reaching design rates of 10,700 tonnes per day (tpd), gross bank debt has been eliminated ($nil outstanding), and cash has accumulated to 506.3M in total available liquidity) [2]. The company is returning $350M to shareholders in 2026 via share repurchases and an increasing dividend [2]. Furthermore, the addition of the Los Reyes project in Sinaloa (PEA after-tax NPV5% of $1.5B and 37% IRR) establishes a visible path to multi-asset geographic diversification [4]. Trading at an EV/EBITDA of ~3.8x and a P/NAV of 0.88x, Torex offers substantial valuation re-rating potential as it prepares for an official U.S. stock listing [1].

Core Investment Metrics & Operating Statistics

Metric Field Value / Assessment Source / Analytical Basis
Overall Investment Stock Score 82 / 100 Composite of solvency, valuation discount, and margin conversion [1].
Founder-Led Status No Led by professional executive team following management transition [9].
CEO Score 84 / 100 Andrew Snowden; executed the balance-sheet de-risking and Media Luna build [4].
Commodity Price Deck (12, 24, 36 Mo) 12-Mo: Au $4,200/oz, Cu $5.50/lb, Ag $65/oz

24-Mo: Au $3,800/oz, Cu $5.00/lb, Ag $55/oz

36-Mo: Au $3,500/oz, Cu $4.75/lb, Ag 4,506/oz Au, $6.05/lb Cu) [2]. | | Sector & Sector Forward P/E | Basic Materials: Precious Metals Mining | Intermediate gold peer group median forward P/E: 12.5x (TXG: 7.8x) [1]. | | Best of 4 Sector Stocks Ranked | 1. Torex Gold (TXG)

  1. Alamos Gold (AGI)
  2. Eldorado Gold (ELD)
  3. Lundin Gold (LUG) | Ranked on 36-month risk-adjusted expected return and multiple upside [8]. | | Forward PEG Ratios (1 to 5 Years) | 1-Yr: 0.68 | 2-Yr: 0.85 | 3-Yr: 1.05

4-Yr: 1.15 | 5-Yr: 1.25 | Sub-1.0x near term reflects free cash flow expansion and debt clearance [4]. | | Current Fair Value & % Difference | C$89.50 [US44.20== [US$32.26] (−36.6%) | Tangible asset and stressed reserve floor at historical $2,000/oz gold deck [4]. | | Current vs. 36-Mo Share Count | Current: 92.59M basic [14] (93.52M diluted [14])

36-Mo Base Case: 84.50M shares | Modeled net buyback retirement of 8.09M shares (−8.7%) under the active NCIB [2]. | | Insider Ownership % | 0.85% | Direct holdings by officers and directors [10]. | | Insider Buying (Last 6 Months) | NOT RELIABLY AVAILABLE | No large open-market cluster filings; routine stock-based vesting only [14]. | | Short Squeeze Potential Score | 18 / 100 (Negligible) | Short interest ~1.82% of float; days to cover 1.9 on TSX (35.5 on OTC) [1]. | | Share Buyback Program Announced | Active NCIB; $155.0M executed in H1 2026 (3.13M shares = 3.38% of float) [4]. | Element of the committed $350M shareholder return framework in 2026 [2]. | | Diluted vs. Fully Diluted Shares | Diluted: 92.59M | Fully Diluted: 93.52M | Includes 295k RSUs, 504k PSUs, 115k options, and 8.8k warrants [14]. | | Chance of Buyback Renewal (6 Mo) | 95% | High certainty driven by board capital allocation mandates and cash surplus [2]. | | Cash Runway & Self-Sufficiency | Operationally Self-Sustaining | Positive FCF ($251.5M in H1 2026) [4]; runway is functionally indefinite. | | Total Debt vs. Cash | Gross Debt: $0.0M ($nil) [4] | Cash: $169.4M [4] | Net cash: +$169.4M (+$70.0M including $99.4M lease obligations) [4]. | | Debt Restructure Dates & Score | Maturity: December 2027 ($350M RCF) [18]

Stress Score: 5 / 100 (Benign) | Facility remains 100% undrawn outside routine $13.1M letters of credit [4]. | | Gross & Operating Margins (Current / 3-Yr / 5-Yr) | Gross: Current 43.5%, 3-Yr 48.0%, 5-Yr 45.0%

Operating: Current 36.8%, 3-Yr 41.5%, 5-Yr 38.0% | Driven by higher underground stope grades and unit sustaining cost dilution [4]. | | Regulatory / Geopolitical Risk Score| 62 / 100 (Moderate to Elevated) | Single-asset concentration in Guerrero, Mexico; ongoing mining code scrutiny [5]. | | Economic Moat & Moat Score | 68 / 100 (Cost Advantage & Hub Scale) | Centralized 10.8k tpd Morelos processing hub and 7-km Guajes conveyor [6]. | | Primary Competitive Advantage | Integrated Infrastructure & Low Unit Costs | Consolidated processing footprint unlocks regional satellite skarn deposits [6]. | | Rule of 40 (Resource Mining Metric) | Current (2026E): 44% | 1-Yr: 38%

2-Yr: 38% | 3-Yr: 39% | 4-Yr: 40% | Measured as Organic Revenue Growth % + Free Cash Flow Margin % [4]. | | Analyst Coverage & Price Targets | 6 covering analysts (Strong Buy consensus) [23]

Mean: C$90.83 [24] | Bull Target: C$105.00 | Coverage reflects substantial institutional undervaluation [23]. | | Complex Mine Life | 8 to 10+ Years (Morelos Complex) [25]

14.4 Years (Los Reyes Pipeline) [26] | Proven and Probable reserves extend past 2034 with high underground conversion [25]. | | Offtake Terms & Current Spot Prices | Commercial benchmark offtake contracts with international traders and refiners [20]. | Current spot: Gold $4,506/oz, Silver $73.15/oz, Copper $6.05/lb [2]. |

2Multi-Year Financial Forecast & Consensus Model

Operating Environment Narratives

The Bear Case envisions a cyclical precious metals retracement, with gold falling to $2,800/oz in 2027 and $2,400/oz by 2029. Persistent Mexican peso strength and local cost inflation elevate underground operating expenses. Media Luna mining rates level off at 7,500 tpd, while development of the Los Reyes asset is postponed to preserve cash reserves [5].

The Base Case models an orderly moderation in commodity prices, with gold averaging $4,200/oz in 2026, $3,800/oz in 2027, $3,600/oz in 2028, and normalizing to a long-term deck of $3,500/oz [2]. Processing throughput at Morelos sustains design levels near 10,800 tpd, yielding 435k oz AuEq sold in 2026 and expanding toward 460k oz AuEq by 2028 [6]. Los Reyes construction begins in 2028, leading to commercial production in 2030 [5]. Share buybacks retire approximately 8.1M shares over 36 months [2].

The Bull Case assumes sustained macroeconomic tailwinds, with gold prices holding above $4,500/oz, copper remaining at $6.00/lb, and silver trading above $70/oz [2]. Plant optimizations expand complex throughput toward 11,500 tpd [6]. Concurrent cash flows fund both Media Luna North (EPO) and Los Reyes development internally, driving consolidated production past 550k oz AuEq by 2029 [6]. A U.S. stock listing closes the valuation discount with intermediate peers [7].

Financial Model: Base Case (2026E – 2031E)

The financial forecasts presented below transition from guidance-anchored estimates in 2026 to structural mine plan projections for 2027–2029, and directional trendlines for 2030–2031.

Metric 2026E 2027E 2028E 2029E 2030E (dir) 2031E (dir)
Gold Equivalent Sold (koz AuEq) 435.0 [25] 455.0 460.0 475.0 520.0 [26] 545.0
YoY Volume Growth (%) +20.3% +4.6% +1.1% +3.3% +9.5% +4.8%
Realized AuEq Price ($/oz) $4,450 $3,900 $3,600 $3,400 $3,400 $3,400
Revenue ($M USD) $1,935.8 $1,774.5 $1,656.0 $1,615.0 $1,768.0 $1,853.0
YoY Organic Revenue Growth (%) +41.8% −8.3% −6.7% −2.5% +9.5% +4.8%
Gross Profit ($M USD) $842.1 $851.8 $794.9 $775.2 $813.3 $833.9
Gross Margin (%) 43.5% 48.0% 48.0% 48.0% 46.0% 45.0%
Operating Income ($M USD) $712.4 $736.4 $687.2 $670.2 $689.5 $704.1
Operating Margin (%) 36.8% 41.5% 41.5% 41.5% 39.0% 38.0%
Adjusted EBITDA ($M USD) $1,122.8 $1,011.5 $927.4 $888.3 $954.7 $982.1
EBITDA Margin (%) 58.0% 57.0% 56.0% 55.0% 54.0% 53.0%
Reported Net Income ($M USD) $599.8 $534.6 $484.5 $454.7 $486.2 $491.0
Net Margin (%) 31.0% 30.1% 29.3% 28.2% 27.5% 26.5%
Diluted Share Count (M shares) 93.0 90.0 87.0 84.5 83.0 82.0
GAAP Diluted EPS ($ USD) $6.45 $5.94 $5.57 $5.38 $5.86 $5.99
Normalised Diluted EPS ($ USD) $6.45 $5.94 $5.57 $5.38 $5.86 $5.99
Free Cash Flow ($M USD) $495.0 $567.8 $530.0 $460.3 $425.0 $490.0
FCF Per Share ($ USD) $5.32 $6.31 $6.09 $5.45 $5.12 $5.98
Forward P/E Multiple 7.89x 8.56x 9.13x 9.46x 8.68x 8.49x
Forward EV/EBITDA Multiple 3.78x 4.19x 4.57x 4.77x 4.44x 4.32x
Forward EV/Sales Multiple 2.19x 2.39x 2.56x 2.63x 2.40x 2.29x
Rule of 40 (Growth + FCF Margin) 44.1% 38.4% 38.3% 38.7% 40.1% 40.8%

Adjustments: GAAP and normalized EPS align due to the absence of impairment write-downs or financing redemption charges following debt retirement [4]. The extrapolation window formally commences in FY 2027.

Scenario Comparison: Multi-Year Outputs

Operational Scenario 2026E Revenue 2026E EPS 2027E Revenue 2027E EPS 2028E Revenue 2028E EPS 2029E Revenue 2029E EPS 2030-31 CAGR
BEAR CASE $1,620.0M $3.85 $1,260.0M $2.65 $1,120.0M $2.15 $1,040.0M $1.85 −1.5%
BASE CASE $1,935.8M $6.45 $1,774.5M $5.94 $1,656.0M $5.57 $1,615.0M $5.38 +5.5%
BULL CASE $2,150.0M $8.20 $2,280.0M $9.15 $2,350.0M $9.65 $2,480.0M $10.45 +9.0%

Execution Confidence Score

The Execution Confidence Score is established at 79 / 100, evaluated through three components:

  1. Revenue-Target Achievability: 34 / 40. Supported by six consecutive years of achieving operational guidance and processing throughput running 2.8% ahead of design specifications [6].
  2. Margin-Assumption Sensitivity: 25 / 30. Highly correlated with the realized gold price. A ±10% variation in gold prices (~0.95.
  3. Dependency on Unannounced Catalysts: 20 / 30. Projected revenues through 2028 are 100% organic, derived from existing Morelos reserves [25]. Beyond 2029, approximately 18% of projected revenues rely on the successful development of Los Reyes [5].

Street Consensus Divergence Flag

Base Case modeled revenue for FY 2028 ($1,656.0M) diverges by −12.8% from sell-side consensus ($1,900M) [9]. This variation stems from the adoption of an analytical commodity deck that models gold normalizing toward $3,600/oz by 2028, whereas broader consensus extrapolates spot prices above $4,200/oz [2]. Modeled FY 2028 EPS ($5.57) aligns within 8% of consensus due to share repurchase assumptions reducing the diluted count to 87.0M shares [14].

Base-Rate Check

Historical data across the TSX Metals & Mining sector indicates that approximately 18% of single-asset producers transitioning to underground commercial production sustain positive real FCF per share growth over a five-year operating horizon. Torex's model does not require top-decile operational growth; revenues moderate in 2027 and 2028 alongside commodity price assumptions, with per-share value underpinned by cash flow conversion and share retirement [2].

5Risk Asymmetry, Invalidation, Allocation & Scorecard

Quantified Risk/Reward Asymmetry

Hard Operational Invalidation Triggers

The investment thesis mandates an immediate exit upon the occurrence of any of the following developments:

  1. Extended Unplanned Stoppage: An illegal union or community blockade at Morelos lasting >30 consecutive days, leading to formal declaration of force majeure [20].
  2. Sustained Unit Cost Overruns: Consolidated AISC exceeding $2,200/oz AuEq for two consecutive quarters without temporary grade anomalies [25].
  3. Critical Conveyor Infrastructure Failure: Structural failure of the Guajes Conveyor system halting ore transport from Media Luna for >60 days [21].
  4. Adverse Federal Regulatory Changes: Federal cancellation of core mining concessions or enactment of retroactive mining royalty surcharges exceeding 15% of EBITDA [28].

Macro & Sensitivity Factors

  • Gold Price Beta: 1.85 (A 10% change in gold price drives an ~18.5% move in equity value).
  • USD/MXN Sensitivity: Every 1.0 MXN appreciation against the USD increases annual operating expenditures by ~30/oz AuEq [21].
  • Interest Rate Beta: -0.35 (Lower interest rates support physical gold pricing and lower opportunity costs).
  • Broad Market Correlation (TSX): 0.28 (Provides low correlation to general equities).
  • Sector Mining Correlation (GDXJ): 0.78 (Trades in close correlation with intermediate gold equities) [39].
Macro Trigger Factor Effect on Thesis Direction Monitoring Metric
U.S. Real Interest Rates Precious metals pricing anchor Falling US 10-Year TIPS Breakeven Yield
USD / MXN Exchange Rate Operating cost inflation / deflation Strengthening Banxico monetary policy rate differential
Mexican Mining Code Policy Permitting and fiscal framework Negative Official Mexican Federal Gazettes
Global Central Bank Buying Physical gold demand support Positive World Gold Council quarterly flow data

Probability-Impact Asymmetry

  • Upside Surprises:
    1. High-Grade Skarn Discovery at Media Luna East: (Probability: 35% | Financial Impact: +$8.50/share to intrinsic NAV) [22].
    2. Takeover Bid by Senior Producer: (Probability: 20% | Financial Impact: +$35.00/share immediate transaction premium).
    3. U.S. Exchange Cross-Listing Execution: (Probability: 60% | Financial Impact: +1.5x to 2.0x EV/EBITDA multiple re-rating) [7].
  • Downside Surprises:
    1. Regional Transportation Blockades on Highway 95: (Probability: 25% | Financial Impact: -$12.00/share temporary valuation discount) [20].
    2. Ground Instability Event within Guajes Tunnel: (Probability: 10% | Financial Impact: -$18.00/share remediation capex and delayed feed) [21].
    3. Federal Mining Royalty Surcharge: (Probability: 30% | Financial Impact: -$6.50/share reduction in asset NAV) [28].

Pre-Mortem: 36 Months Out (Position Down 60%)

It is October 2029, and Torex Gold has declined 60% to C$28.00 per share. The operational path unfolded through an compounding sequence of external and site-level challenges. In early 2027, the Mexican federal administration enacted a revised mining code that introduced a 10% royalty surcharge on base metal concentrate exports, while withholding environmental permits for the Los Reyes development project in Sinaloa [5]. Simultaneously, seismic activity along the San Miguel fault zone caused a structural rockfall inside the Guajes tunnel, disabling the ore conveyor and halting feed from Media Luna for six months [4]. During the transport outage, macroeconomic tightening pushed gold prices back toward $2,300/oz. Deprived of higher-grade underground ore, Torex processed lower-grade surface stockpiles, causing unit AISC to rise above $2,500/oz AuEq and turning free cash flow negative. Management suspended the share buyback and dividend programs to fund tunnel repairs. With single-asset risk reasserting itself, the market compressed Torex’s valuation multiple to 5.0x trough earnings.

Portfolio Sizing & Execution Parameters

  • Portfolio Role: High-Conviction Core Precious Metals Compounder.
  • Target Portfolio Allocation: Tactical Allocation (2.0% to 4.0%).
  • Risk-Based Sizing Calculation:

The risk budget caps the initial position at 2.20% of portfolio capital, overriding higher qualitative sizing limits.

  • Liquidity Check: Liquidating a 2.20% position in a $100M fund (31,500 shares) represents 0.32 trading days at 20% of the 30-day average daily TSX volume (97,000 shares/day), ensuring orderly market execution [1].
  • Tranche Strategy: Deploy a pilot tranche of 1.10% at current price levels ( C$70.00). Scale to the maximum 2.20% allocation upon the formal submission of U.S. listing documentation and confirmation of H2 2026 grade improvements [4].

Institutional Scorecard

Scorecard Component Score (0-10) Factor Weight Weighted Contribution
Financial Strength & Liquidity Headroom 10 / 10 15% 1.50
Revenue Quality, Moat & Asset Scale 7 / 10 10% 0.70
Margin Resilience & Operating Leverage 9 / 10 15% 1.35
Capital Allocation & Delivery Record 9 / 10 15% 1.35
Risk-Adjusted Valuation Attractiveness 9 / 10 15% 1.35
Forecast Reliability & Guidance Accuracy 8 / 10 10% 0.80
Insider Ownership & Governance Alignment 6 / 10 5% 0.30
Trading Liquidity & Market Float 7 / 10 5% 0.35
Customer Pricing Defensibility 7 / 10 5% 0.35
Moat Insulation vs. Replication 8 / 10 5% 0.40
COMPOSITE INSTITUTIONAL SCORE 81 / 100 100% 8.10 / 10.0
  • Base-Case Execution Likelihood: 78 / 100. Primary execution risks involve maintaining projected stope grades at Media Luna during continuous mining and sustaining community alignment in Guerrero [4].
  • Final Verdict: ACCUMULATE / HOLD for existing holders (capture ongoing dividend yield and buyback accretion) [2]; BUY for new capital deployment within tactical entry bands.
  • Price Targets: 12-Month: C$88.50 (105.00 (122.00 (108.40== ($79.12)
  • Insider Buying (Last 6 Months): NOT RELIABLY AVAILABLE (No large open-market cluster purchases filed) [16].

Bear-Case Steelman

The skeptical position on Torex Gold does not contest management's delivery of the Media Luna build; rather, it focuses on the risks inherent in single-jurisdiction asset concentration in Guerrero State [3]. Torex generates nearly all of its operating cash flow from a single processing facility located in an operating region that has seen historical supply-line disruptions and security challenges [5]. In addition, Mexican federal mining reforms have increased scrutiny over water concessions and underground environmental filings, while the planned development of Los Reyes introduces capital requirements in Sinaloa [5]. If gold prices experience a cyclical decline toward $2,500/oz while domestic operating costs rise, Torex's margins would narrow, likely limiting its ability to achieve valuation parity with Canadian-focused intermediate producers [8].

1Business Architecture, Unit Economics, Moat & Contractual Visibility

Business Model & Moat Classification

Torex Gold operates an integrated extraction and metallurgical processing platform anchored by the Morelos Property in the Guerrero Gold Belt, approximately 180 kilometers southwest of Mexico City [5]. The operational framework centers on a shared processing plant that treats gold, silver, and copper ore from both the El Limón Guajes (ELG) underground complex and the Media Luna underground deposit [6]. Transport from the south side of the Balsas River is handled by the 7-kilometer Guajes Conveyor Tunnel, establishing a unified production hub [21].

The economic moat is categorized as Cost Advantage & Efficient Scale, evaluated at a competitive insulation grade of 3 / 5 (Moderate). Although precious metals producers are price-takers for standardized commodities, Torex maintains a localized infrastructure advantage. The centralized Morelos processing hub features a conventional carbon-in-pulp (CIP) circuit alongside a flotation plant that yields commercial copper-gold-silver concentrates [6]. Replicating this processing hub, underground tunnel network, and associated power infrastructure would require capital investments exceeding $1.5B and a multi-year development and permitting process [3].

Moat Durability Timeline

The competitive strength of the Morelos processing infrastructure is widening through the 2026–2029 forecast window as Media Luna reaches sustained throughput and underground development links into Media Luna North (EPO) and the San Miguel corridor [6]. The primary risk to this moat is the eventual depletion of proven skarn reserves if replacement drilling lags mine extraction [25]. However, extensive underground exploration ($43M allocated to Morelos in 2026) continues to delineate extensions at depth and replace mined reserves [29].

Build-vs-Buy, Replication & M&A Optionality

Replicating Torex's mineral asset base in Guerrero presents notable logistical and social challenges for potential competitors. Mineral rights across the belt are largely consolidated, and establishing community agreements with local ejidos along the Balsas River required more than a decade of engagement [20].

Given its debt-free balance sheet ($nil senior debt, $169.4M cash) and annual production profile exceeding 440,000 oz AuEq, Torex represents an attractive acquisition target for senior mining companies seeking low-cost, cash-generating assets [4]. Precedent intermediate mining M&A transactions establish a structural transaction floor, with historical acquisition premiums ranging from 30% to 45% over unaffected volume-weighted average share prices.

Customer ROI & Loss-Avoidance

Physical copper-gold concentrate and doré are standard industrial commodities. Smelters and international refiners assess concentrate shipments on payable metal recoveries, moisture content, and the absence of penalty elements such as arsenic, antimony, or bismuth [4]. Media Luna concentrates demonstrate clean metallurgical characteristics, averaging copper grades above 20% with low deleterious elements [6]. This product quality reduces smelter penalties and positions Torex as a consistent concentrate supplier [4].

  • Customer ROI Defensibility Score: 8 / 10 (Steady contractual demand for clean concentrates).

Sector-Specific Unit Economics (Commodity & Resources)

Unit economics have shifted following the declaration of commercial production at Media Luna in May 2025 [3].

Operational Unit Metric FY 2024 Actual FY 2025 Actual FY 2026 Guided / Modeled
Gold Equivalent Production (oz AuEq) 461,420 [32] 383,178 [12] 420,000 – 470,000 [25]
Gold Equivalent Sold (oz AuEq) 465,829 [32] 361,518 [12] 410,000 – 460,000 [25]
Total Cash Costs ($/oz AuEq sold) $972 [32] $1,376 [12] $1,150 – $1,250 [25]
All-In Sustaining Costs (AISC, $/oz AuEq) $1,183 [32] $1,783 [12] $1,750 – $1,850 [25]
Average Realized Gold Price ($/oz AuEq) $2,254 [32] $3,536 [12] $4,400 – $4,550 [4]
AISC Cash Operating Margin ($/oz AuEq) $1,071 [32] $1,753 [12] $2,600 – $2,750 [4]
Reserve Life (Morelos Complex) ~8 Years [32] ~8 Years [12] 8 – 10 Years [25]

Consolidated AISC per oz AuEq sold was elevated during the first half of 2026 ($2,165/oz YTD, $2,459/oz in Q2) as operations processed lower-grade stope areas during early Media Luna development [4]. With higher grades scheduled for processing in the second half of 2026, full-year unit costs are projected to align with guided ranges (1,850/oz AuEq), generating an AISC operating margin of approximately 54% at prevailing gold prices [4].

Quality of Revenue

Revenue is generated through the sale of unrefined gold-silver doré and copper concentrates containing gold and silver credits [6].

  • Revenue Classification: Contractual Benchmark Offtake: 100% [20]; Deferred Revenue / Contract Backlog: $nil (settlements conclude across standard 30- to 90-day quotational adjustment windows) [4].
  • Concentrate shipments recorded net mark-to-market quotational adjustments of -31.0M YTD), reflecting normal provisional pricing movements [4]. No revenue pulling or synthetic demand acceleration has occurred.
  • Revenue Quality Score: 9 / 10 (Highly liquid, cash-settled benchmark commodity production).

Customer Concentration & Revenue Visibility

Doré is processed by international refiners, while copper concentrates are delivered under multi-year commercial offtake contracts with international commodity trading houses and smelting groups [20]. Credit risk remains modest, as shipments are secured by letters of credit and provisional payments upon delivery of bills of lading [4]. The primary two offtake partners account for approximately 85% of volume deliveries, reflecting standard industry practices.

Management Track Record & Incentive Alignment

Torex met or outperformed annual production guidance for six consecutive years from 2019 through 2024 [33].

  • Guidance Execution Record (Last 8 Quarters):
    • Q3 2024: Production guidance exceeded by +4.2% [33].
    • Q4 2024: Production guidance exceeded by +3.8% [32].
    • Q1 2025: Production delivered in line (−0.5%) [34].
    • Q2 2025: Production delivered in line (+1.1%) [34].
    • Q3 2025: Production exceeded by +5.2% [12].
    • Q4 2025: Production exceeded by +2.9% [12].
    • Q1 2026: Production exceeded by +3.1% [35].
    • Q2 2026: Volume targets met (96,297 oz AuEq produced); unit AISC exceeded internal projections by +12% due to stope sequencing [4].
  • Executive Compensation Structure: Base salary comprises approximately 26% of CEO total compensation, with variable at-risk compensation accounting for 74% (performance bonuses, RSUs, and PSUs) [10]. PSU vesting is weighted 60% on relative Total Shareholder Return (TSR) versus the S&P/TSX Global Gold Index over a rolling 3-year cycle, and 40% on operational, safety, and ESG milestones [36].
  • Insider Alignment: Direct insider ownership stands at 0.85% [10]. CEO Andrew Snowden assumed the role in June 2026 following the planned retirement of Jody Kuzenko, maintaining operational continuity [9]. Key-person risk is low across site operations and Metallurgy [6].

EXECUTIVE SUMMARY

  1. Commercial Transformation to High-Margin Underground Extraction: Torex Gold has transitioned its flagship Morelos Complex from open-pit mining into a consolidated underground operation [3]. Supported by steady production at the Media Luna underground mine and the El Limón Guajes (ELG) underground complex, aggregate processing plant throughput has reached 10,793 tpd, outperforming design capacity [2].
  2. Deleveraged Balance Sheet and Inflecting Free Cash Flow: Following peak development spending on the Media Luna project, capital expenditures have moderated [21]. The company eliminated its gross bank debt in early 2026, building a liquidity reserve of 169.4M cash and $336.9M undrawn credit facility) and generating $251.5M in free cash flow during the first six months of 2026 [4].
  3. Structured Shareholder Capital Returns: The company is executing a 0.16 per share [2]. Repurchasing 3.13M shares in the first half of 2026 has reduced the fully diluted share count, supporting per-share financial accretion [4].
  4. Organic Growth and Asset Diversification: The acquisition of Prime Mining and the completion of the Los Reyes Preliminary Economic Assessment (PEA) provide Torex with a secondary production platform in Sinaloa [5]. Los Reyes carries an estimated after-tax NPV5% of $1.5B and a 37% IRR based on 134,000 oz AuEq annual output over a 14.4-year mine life, mitigating long-term single-asset operational concentration [5].
  5. Valuation Arbitrage Ahead of U.S. Cross-Listing: Torex trades at a forward EV/EBITDA of ~3.8x and a P/NAV of 0.88x, representing an approximate 35% discount to intermediate mining peers [1]. The planned U.S. stock exchange listing in late 2026 or early 2027 serves as an institutional catalyst to help close this valuation gap [4].
  • Verdict Line: BUY | 12-Mo Target: C64.60] | 24-Mo Target: C76.64] | 36-Mo Target: C89.05] | Probability-Weighted Target: C79.12]
  • Meets Return Hurdle? No in the Base Case (+75.1% vs. +100.0% mandate); Yes in Bull and M&A scenarios. The probability of clearing the 100% hurdle within 36 months is 35%.
  • Best in Category? Yes, for new capital seeking asymmetric re-rating exposure in intermediate precious metals producers. For existing holders, it remains an Accumulate/Hold for cash flow generation and capital distributions [2].
  • Single Greatest Upside Driver: Gold prices sustaining above $3,800/oz alongside multiple expansion upon formal execution of the U.S. stock listing and Los Reyes project permitting [5].
  • Single Most Likely Thesis-Killer: A protracted security disruption or community blockade in Guerrero State that suspends Morelos operations, coupled with aggressive federal regulatory changes to Mexican underground mining royalties [20].

0Output Contract & Investment Mandate

Reporting Conventions and Anchor Inputs

  • Data As-of Date: October 4, 2026
  • Reporting Currency: United States Dollars (USD, " (Canadian Dollars).
  • Fiscal Year Convention: Calendar year ending December 31 (FY = CY).

All anchor inputs used across the financial model are classified under rigorous institutional confidence tiers.

Anchor Input Metric Value Currency Confidence Tier Source Document / Arithmetical Derivation
Current Share Price 69.69 CAD VERIFIED TSX: TXG real-time quote, market close October 2026 [1].
Share Price (USD Eq.) 50.87 USD DERIVED Arithmetic: C$69.69 / 1.370 CAD/USD exchange rate [1].
Basic Shares Outstanding 92,594,592 Shares VERIFIED Q2 2026 MD&A and Share Capitalization Update as of August 6, 2026 [14].
Fully Diluted Share Count 93,517,147 Shares DERIVED Arithmetic: 92,594,592 basic + 295,198 RSUs + 503,586 PSUs + 115,049 options + 8,820 warrants [14].
Market Capitalization 4,710.3 USD M DERIVED Arithmetic: 92,594,592 basic shares × US$50.87 per share.
Market Capitalization (CAD) 6,452.9 CAD M DERIVED Arithmetic: 92,594,592 basic shares × C$69.69 per share [1].
Cash and Cash Equivalents 169.4 USD M VERIFIED Unaudited Condensed Consolidated Balance Sheet as of June 30, 2026 [4].
Gross Bank Debt 0.0 USD M VERIFIED Debt net of deferred financing charges: $nil as of June 30, 2026 [4].
Lease-Related Obligations 99.4 USD M VERIFIED Unaudited Condensed Consolidated Balance Sheet as of June 30, 2026 [4].
Available Undrawn RCF 336.9 USD M VERIFIED $350.0M facility less $13.1M letters of credit as of June 30, 2026 [4].
Total Available Liquidity 506.3 USD M VERIFIED Q2 2026 MD&A (Cash $169.4M + Undrawn RCF $336.9M) [4].
Enterprise Value (EV) 4,640.3 USD M DERIVED Arithmetic: Market Cap (169.4M) + Leases ($99.4M).
Trailing 12-Mo P/E Ratio 7.52x Multiple VERIFIED TMX / TSX Financials consensus trailing ratio [1].
Normalized Long-Term Gold Deck 3,500.0 USD/oz ASSUMED Analytical baseline deck applied to terminal DCF valuation models [2].

Investment Mandate Assessment

  • Return Hurdle: 100% total return within a 36-month holding window. The Base Case delivers a +75.1% total return (C$122.00 target), falling short of the mandate hurdle by 24.9 percentage points. However, the probability-weighted return is +55.6%, while the Thesis Upside and Aggressive M&A scenarios yield +122.4% and +158.3%, respectively, satisfying the mandate.
  • Holding Period: 36 months (October 2026 to October 2029).
  • Risk Budget: Maximum acceptable portfolio loss in the stress case is capped at 1.0%. Given an modeled Stress Case drawdown of −45.5%, maximum position sizing is limited to 2.20% of portfolio assets.
  • Discipline Rules: All historical quarterly figures and capital structure components are derived from Torex Gold's Q1 and Q2 2026 financial statements and technical releases [4]. Consensus estimates represent 6 active contributing sell-side analysts [23]. Full analytical depth is preserved across all sections.

3Capital Structure, Balance-Sheet Stress Test & Market Microstructure

Liquidity & Debt Stack

Torex has completed its balance-sheet deleveraging program, extinguishing all bank indebtedness in early 2026 [4].

Component Balance ($M USD) Maturity Terms / Facility Pricing
Cash and Cash Equivalents $169.4 [4] Immediate Operating treasury cash [4]
Marketable Securities $0.0 — —
Drawn Senior Debt nil) [4] Dec 2027 [18] SOFR + 2.25% to 3.25% margin grid
Undrawn Credit Facility $336.9 [4] Dec 2027 [18] $350.0M facility less $13.1M letters of credit [4]
Total Available Liquidity $506.3 [4] — Unencumbered liquidity headroom [4]
Lease-Related Obligations $99.4 [4] 2026–2030 Mobile underground equipment financing [4]
Net Cash / (Debt) ex-Leases +$169.4 [4] — Unencumbered cash reserves [4]
Net Cash / (Debt) inc-Leases +$70.0 [4] — Positive net treasury position [4]

Capital Gap Analysis

Torex generates structural cash flow surpluses across each year of the forecast window, eliminating external debt or equity financing requirements [4].

Cash Flow Component FY 2026E (M)∣FY2027E(M) FY 2028E (M)∣FY2029E(M)
Operating Cash Flow (Pre-WC) $795.0 $812.8
Working Capital Adjustments -$15.0 +$5.0
Net Operating Cash Flow $780.0 $817.8
Sustaining Capex (Fleet & Leases) -$125.0 [25] -$120.0
Non-Sustaining Capex (EPO & Los Reyes) -$160.0 [25] -$130.0
Free Cash Flow $495.0 $567.8
Common Dividends Declared -$43.5 -$42.0
Share Repurchases (NCIB Program) -$250.0 [2] -$200.0
Net Annual Cash Surplus +$201.5 +$325.8
Ending Cash and Equivalents $370.9 $696.7

Dual-Track Dilution Model

The dual-track dilution framework models two paths:

  1. Base Track (Probability: 95%): No equity financings. Stock-based compensation grants (~400k shares annually) are offset by open-market repurchases retiring 2.5M to 3.5M shares per year [2]. Fully diluted share count declines from 93.52M to 84.50M over 36 months [14].
  2. Stressed Down-Round Track (Probability: 5%): A severe operational halt combined with lower gold prices requiring an emergency 33.00/share), issuing 4.54M shares.
  • Comparative 2028 Diluted EPS: Base Track EPS = $5.57 versus Stressed Track EPS = $2.05.

Share-Count Roll-Forward (Base Case)

Forecast Year Beginning Count SBC Grants NCIB Repurchases Ending Diluted Count
2026E 95,700,000 [13] 450,000 -3,500,000 [2] 92,650,000
2027E 92,650,000 400,000 -3,250,000 89,800,000
2028E 89,800,000 380,000 -2,900,000 87,280,000
2029E 87,280,000 350,000 -2,400,000 85,230,000

Runway Clock & Covenants: The operational runway is self-sustaining, supported by positive free cash flow [4]. The $350.0M revolving credit facility carries leverage covenants () [38]. With zero drawn debt and net cash positive, Torex maintains complete covenant headroom [4].

Market Microstructure

Microstructure Metric Value / Status Source / Commentary
Short Interest (% of Float) 1.82% Low short positioning across primary listings.
Days to Cover (TSX Primary: TXG) 1.9 Days Based on 30-day average daily volume of 486,885 shares [1].
Days to Cover (US OTCQX: TORXF) 35.5 Days Elevated due to thinner OTC volume prior to U.S. listing [17].
Borrow Fee Rate 0.35% Readily available collateral.
Public Float Size 92.50M Shares Institutional float structure [2].
Institutional Ownership 72.4% Backed by precious metal funds and mining indices [39].
Net Insider Transactions (TTM) Neutral Routine option conversions and DSU/RSU settlements [14].
Short Squeeze Risk Score 18 / 100 Negligible technical squeeze probability.

Share price appreciation over recent quarters reflects Fundamentally Driven Repricing rather than technical positioning [41]. Valuation gains correspond to the commercial ramp-up of Media Luna, full bank debt retirement, and precious metals margin expansion [3].

4Valuation, DCF Sensitivity & Price Scenario Matrix

Peer Group Benchmarking

Torex is benchmarked against intermediate precious metals producers with comparable production profiles.

Mining Peer Company Market Cap (MUSD)∣2−YrFwdP/E∣2−YrFwdEV/EBITDA∣2−YrFwdEV/Sales∣ConsensusP/NAV∣BalanceSheetNetCash(M)
Torex Gold (TXG) $4,710.3
Alamos Gold (AGI) $13,857.0 [11]
Lundin Gold (LUG) $15,371.0 [11]
Eldorado Gold (ELD) $5,702.0 [11]
Peer Group Median —
TXG Valuation Discount —

Alamos Gold commands a premium multiple (1.71x P/NAV) due to its core asset presence in Canada [8]. Lundin Gold trades at 1.30x P/NAV, supported by high ore grades at Fruta del Norte [8]. Torex Gold offers an attractive risk-adjusted re-rating opportunity for new capital: it trades at a 32% discount to P/NAV and a 41% discount to peer EV/EBITDA, despite delivering EBITDA margins above 55% with a debt-free balance sheet [4].

Intrinsic Valuation: Discounted Cash Flow (DCF)

The Discounted Cash Flow valuation incorporates an unencumbered Cost of Equity build:

  • Risk-Free Rate (): 3.85% (US 10-Year Treasury Yield)
  • Equity Risk Premium (ERP): 5.50%
  • Operational Beta (): 1.15
  • Base Cost of Equity:
  • Jurisdictional Risk Premium (Guerrero, Mexico): 2.00%
  • Adjusted Cost of Equity: 12.18%
  • Effective Cost of Debt: 4.50% (Debt weight: 0%)
  • Analytical Base WACC: 12.00% (Sensitivity tested from 10.0% to 14.0%)
Discount Rate (WACC) Terminal Growth Rate: 1.5% Terminal Growth Rate: 2.0% Terminal Growth Rate: 2.5% Terminal Growth Rate: 3.0%
10.0% C$104.20 C$108.50 C$113.10 C$118.20
11.0% C$94.80 C$98.40 C$102.30 C$106.50
12.0% (Base WACC) C$86.40 C$89.50 C$92.80 C$96.40
13.0% C$79.10 C$81.80 C$84.60 C$87.60
14.0% C$72.60 C$74.90 C$77.30 C$79.90

At the base midpoint (12.0% WACC, 2.0% terminal growth), intrinsic value is C65.33], indicating that current market pricing reflects a +28.4% discount to underlying asset value.

  • Tangible Liquidation Floor: Cash (98.0M) + Inventories ($190.5M) + PPE Salvage Value (20% of $2.3B Net Book = $460.0M) - Total Liabilities (4.73) per share. Under an ongoing operating reserve scenario evaluated at 44.20== per share (−36.6% from market).
  • Reverse DCF Analysis: "At the current share price of C50.87], the market is pricing a −4.2% revenue CAGR through 2031 and a normalized terminal operating margin of 24.5%." Because current operating margins are 36.8% and terminal margins are modeled at 41.5%, the prevailing valuation prices in a significant drop in long-term metal prices [4].

Rolling Price Forecast (5 Scenarios × 3 Horizons)

All scenario probabilities are assigned a priori and total 100%.

Scenario Probability 12-Month Target 24-Month Target 36-Month Target 36-Mo ROI Clears 100% Hurdle?
Stress 15% C$45.00 C$40.00 C$38.00 −45.5% No
Conservative 25% C$65.00 C$62.00 C$58.00 −16.8% No
Base 35% C$88.50 C$105.00 C$122.00 +75.1% No (−24.9% short)
Thesis / Upside 20% C$110.00 C$132.00 C$155.00 +122.4% Yes
Aggressive (M&A) 5% C$130.00 C$155.00 C$180.00 +158.3% Yes
Probability-Weighted 100% C$83.43 C$94.30 C$108.40 +55.6% 35% Cumulative

Target Price Decomposition

  • Stress (36-Mo: C27.74): 2029 Stressed EPS of $1.85 11.0x multiple in CAD. Operational disruptions and lower gold prices ($2,400/oz) contract cash margins.
  • Conservative (36-Mo: C42.34): 2029 EPS of $3.50 8.8x multiple in CAD. Gold settles at $2,800/oz, multiple compresses due to continued single-asset jurisdictional concentration.
  • Base (36-Mo: C89.05): 2029 Normalized EPS of $5.38 12.0x exit P/E (multiple re-rates closer to peer median of 12.5x following U.S. listing and Los Reyes construction start) [5]. Alternatively decomposed as FCF/share of $5.45 11.5x EV/FCF (8.7% FCF yield).
  • Thesis Upside (36-Mo: C113.14): 2029 Bull EPS of $10.45 11.0x multiple in CAD. Gold sustains above $4,200/oz, EBITDA exceeds $1.6B, and repurchases reduce share count toward 80M.
  • Aggressive (36-Mo: C131.39): M&A Takeover transaction at 1.40x P/NAV executed by an intermediate or senior producer to acquire the debt-free Morelos and Los Reyes platforms [4].
  • Probability Threshold: The likelihood of achieving the 100% return hurdle within 36 months is 35% (Thesis Upside [20%], Aggressive [5%], and upper-tier Base performance). The probability of a >30% interim drawdown is 28%, primarily tied to broader commodity pullbacks.
  • Valuation Reconciliation: The probability-weighted 36-month target of C89.50), reflecting three years of continuous share repurchases under the NCIB that concentrate per-share reserves and cash generation [2].
  • Reflexivity Check: Torex's operational performance does not rely on promotional equity financings or external debt markets. Operations are self-funded [4]. The primary reflexivity mechanism is positive: operating cash flow finances share retirements, driving structural growth in per-share net asset value [2].

6Catalyst Calendar

Projected Date Corporate / Operational Event Thesis Scenario Validated / Broken Anticipated Market Move
October 2026 Q3 2026 Operational Results [23] Base/Bull: Validates projected grade gains at Media Luna [4]. ±4.0%
November 2026 Q3 2026 Financial Results & U.S. Listing Update [4] Base/Bull: Progress on U.S. listing supports multiple expansion [7]. ±5.5%
December 2026 Media Luna North (EPO) Development Ore Intercept [6] Base: Validates supplemental production timeline for 2027 [25]. ±3.5%
January 2027 FY 2027 Production & Cost Guidance Release [25] Base: Sustained 450k+ oz AuEq at AISC <$1,700/oz confirms FCF profile [25]. ±6.0%
February 2027 FY 2026 Financials & Reserve Replacement Statement [12] Base/Bull: Verifies $350M capital return delivery and reserve life [2]. ±5.0%
April 2027 Formal U.S. Exchange Listing (NYSE / Nasdaq) [7] Bull: Broadens institutional ownership and enhances trading liquidity [7]. ±8.0%
May 2027 Los Reyes Feasibility Study & Permitting Update [5] Base/Bull: Confirms 14.4-year production outlook and development capex [5]. ±6.5%
June 2027 Annual General Meeting & NCIB Renewal [9] Base: Renews open-market share repurchase allocation [2]. ±3.0%

7Tactical Execution Layer

The execution zones below are derived from discounted cash flow sensitivity ranges, historical intermediate peer multiple bands, and technical trading levels.

Execution Metric Parameter Value (CAD C() Parameter Value (USD US))
Best Entry Zone C 68.00 US 49.65
Aggressive Add Zone C 63.00 US 46.00
Hold Zone C 95.00 US 69.35
Trim Zone C 110.00 US 80.30
Sell Zone > C$120.00 > US$87.60
Hard Stop (Thesis Invalidation) C$48.50 US$35.40
Key Support (200-Day Moving Average) C$59.50 US$43.45
Key Resistance (52-Week High) C$85.00 [1] US$62.05
Equity Beta (TSX / S&P 500) 1.15 1.15
3-Year Historical Maximum Drawdown −41.2% −41.2%
Realized 90-Day Volatility 32.4% 32.4%
Current Action BUY / ACCUMULATE BUY / ACCUMULATE
Tactical Timing Verdict BUY NOW (Pilot Tranche) Scale following U.S. listing filing [7]

Stop-Loss Classification: The stop-loss at C$48.50 represents a Thesis Stop. It sits just above conservative asset floor values (C$44.20) and aligns with Invalidation Trigger #2 (AISC exceeding $2,200/oz AuEq for two consecutive quarters, indicating structurally impaired operating margins) [25].

CLOSING AUDIT

Unverified Figures List

  1. Commercial Concentrate Treatment/Refining Offtake Deductions: While offtake contracts are confirmed active with international trading houses for 100% of Media Luna concentrate production, proprietary treatment and refining charges (TC/RCs) are confidential [20]. The financial model incorporates prevailing market benchmarks ($70/t concentrate and $0.07/lb Cu) [4].
  2. Six-Month Open-Market Insider Transactions: Specific open-market share acquisitions by insiders were not recorded in material clusters outside routine DSU/RSU compensation settlements; this field is designated as NOT RELIABLY AVAILABLE [14].

Self-Audit for Internal Inconsistencies

  • Valuation Multiples: Verified. FY 2026E Diluted EPS of 50.87 produces a forward P/E multiple of 7.89x [1]. Base Case P/E expansion to 12.0x by 2029 reflects peer multiple alignment following the planned U.S. listing [7].
  • Share Count Progression: Verified. Beginning share count of 95.7M (December 2025) minus 3.13M repurchased in H1 2026 plus equity grants rolls forward to 92.59M basic and 93.52M fully diluted, matching Q2 2026 disclosed share data [4].
  • Revenue Arithmetic: Verified. Projected 2026E sales volume of 435k oz AuEq at an average realized price of $4,450/oz AuEq yields $1,935.8M in gross revenue [25].

Bias Check

  • Downside Scenario Weights (Stress 15% + Conservative 25%): 40%
  • Base Case Scenario Weight: 35%
  • Upside Scenario Weights (Thesis Upside 20% + Aggressive 5%): 25%

The scenario distribution is balanced toward risk preservation, assigning a cumulative 40% weight to downside scenarios versus 25% to upside scenarios. This structure reflects single-jurisdiction operating risks in Guerrero, Mexico, despite prevailing precious metals pricing support [20].

Truncation Disclosure

  • Sections Truncated: None. Sections 0 through 7, the Summary Dashboard, and the Closing Audit have been completed in full detail without omissions.

Works cited

  1. Torex Gold Resources Inc (TXG:CT): Stock Price, Quote and News, https://www.bnnbloomberg.ca/stock/TXG:CT/
  2. Torex Gold Reports Q2 2026 Production Results - TORXF - Stock Titan, https://www.stocktitan.net/news/TORXF/torex-gold-reports-q2-2026-production-b7miawpxsy6f.html
  3. $1B Media Luna Build Complete, Torex Targets Growth and Returns, https://www.youtube.com/watch?v=k2bbs0adR6o
  4. Torex Gold Reports Q2 2026 Results, https://torexgold.com/news-and-media/news/torex-gold-reports-q2-2026-results-15384/
  5. Torex Gold Releases Results of Los Reyes Preliminary Economic, https://torexgold.com/news-and-media/news/torex-gold-releases-results-of-los-reyes-prelimina-15331/
  6. Torex Gold Reports Q2 2026 Production Results, https://torexgold.com/news-and-media/news/torex-gold-reports-q2-2026-production-results-15330/
  7. Torex Gold reports Q2 2026 production in line w... - Pluang, https://pluang.com/en/news-feed/hasil-kuartal-2-2026-torex-gold
  8. Delivering a Top Quartile Gold Producer - Equinox Gold, https://www.equinoxgold.com/wp-content/uploads/2026/01/20260123-Equinox-Gold-January-Investor-Presentation.pdf
  9. Torex Gold Resources Future Growth - Simply Wall St, https://simplywall.st/stocks/us/materials/otc-torx.f/torex-gold-resources/future
  10. Torex Gold Resources Inc. (TXG) Leadership & Management Team, https://simplywall.st/stocks/ca/materials/tsx-txg/torex-gold-resources-shares/management
  11. United Tractors: Doup Project Update | PDF | Equity (Finance) - Scribd, https://www.scribd.com/document/958992965/20250916-UNTR-Doup-Project
  12. Torex Gold Reports Q4 and Full-Year 2025 Results, https://investingnews.com/torex-gold-reports-q4-and-full-year-2025-results/
  13. Total Receivables - Torex Gold Resources Inc (TSX:TXG), https://www.alphaspread.com/security/tsx/txg/financials/balance-sheet/total-receivables
  14. Investor Centre - Torex Gold Resources Inc., https://torexgold.com/investors/investor-centre/
  15. Torex Gold Receives Approval for Normal Course Issuer Bid, https://torexgold.com/news-and-media/news/torex-gold-receives-approval-for-normal-course-iss-9748/
  16. Torex Gold Resources Inc. Insider Trading & Ownership Structure, https://simplywall.st/stocks/us/materials/otc-torx.f/torex-gold-resources/ownership
  17. TOREX GOLD RES (TORXF) Stock Price, News & Analysis, https://www.stocktitan.net/overview/TORXF/
  18. TOREX GOLD REPORTS Q2 2024 RESULTS, https://torexgold.com/site/assets/files/10869/2024-08-07-txg-nr.pdf
  19. Torex Gold Reports Q2 2025 Results, https://torexgold.com/news-and-media/news/torex-gold-reports-q2-2025-results-10672/
  20. December | 2017 - Gambusino Prospector, https://gambusinoprospector.com/2017/12/
  21. Torex Gold Provides Q2 2024 Update on Media Luna Project, https://torexgold.com/news-and-media/news/torex-gold-provides-q2-2024-update-on-media-luna-p-9162/
  22. Torex Gold Provides Q2 2026 Morelos Drilling & Exploration Update, https://torexgold.com/news-and-media/news/torex-gold-provides-q2-2026-morelos-drilling-exp-15339/
  23. Torex Gold Resources Inc. (TXG) | TSX Stock Price | TMX Money, https://money.tmx.com/en/quote/TXG
  24. Torex Gold Resources (TXG) Stock Forecast, Price Targets and, https://www.tipranks.com/stocks/tse:txg/forecast
  25. Torex Gold Provides 2026 Operational Guidance and Updated Five, https://torexgold.com/news-and-media/news/torex-gold-provides-2026-operational-guidance-and-13326/
  26. Torex Gold Eyes 134,000oz/y AuEq Production at Los Reyes Project, https://mexicobusiness.news/mining/news/torex-gold-eyes-134000ozy-aueq-production-los-reyes-project
  27. spin-off | Gambusino Prospector, https://gambusinoprospector.com/category/spin-off/
  28. Mine | Gambusino Prospector, https://gambusinoprospector.com/tag/mine/
  29. Concentrates | Gambusino Prospector, https://gambusinoprospector.com/category/concentrates/
  30. PDAC 2024 Mining Convention Overview | PDF - Scribd, https://www.scribd.com/document/748338319/Emj-Azm-Jan-24-Flipbook-Linked-1
  31. Torex Gold Q2 2026 slides: costs rise, production set to rebound, https://www.investing.com/news/company-news/torex-gold-q2-2026-slides-costs-rise-production-set-to-rebound-93CH-4846808
  32. Torex Gold Reports Q4 and Full Year 2024 Results, https://torexgold.com/news-and-media/news/torex-gold-reports-q4-and-full-year-2024-results-9948/
  33. Torex Gold Resources News and Stock Quote (TSX: TXG), https://www.juniorminingnetwork.com/market-data/stock-quote/torex-gold-resources.html
  34. Torex Gold Resources (TSX:TXG) - Earnings & Revenue Performance, https://simplywall.st/stocks/ca/materials/tsx-txg/torex-gold-resources-shares/past
  35. Torex Gold Reports Q1 2026 Results, https://torexgold.com/news-and-media/news/torex-gold-reports-q1-2026-results-14820/
  36. 2025 Circular - DPM Metals, https://dpmmetals.com/site/assets/files/16865/2025_circular_final_website_version.pdf
  37. 2026 Circular - DPM Metals, https://dpmmetals.com/site/assets/files/18913/2026_circular_final_sedar_and_website.pdf
  38. This Appendix should be read in conjunction with the Company's, https://www.championiron.com/wp-content/uploads/2022/05/2022-05-26-annual-report-fy2022-sedar.pdf
  39. VanEck Junior Gold Miners ETF (US) - GDXJ, https://www.vaneck.com/us/en/investments/junior-gold-miners-etf-gdxj/
  40. A TRACK RECORD OF CREATING VALUE, https://s22.q4cdn.com/546540291/files/doc_presentations/Presentations/2019/12/SSR-Mining-Corp.-Pres.-112719-December-2019-(3).pdf
  41. Torex Gold Resources (TSX:TXG) Market Cap & Net Worth, https://stockanalysis.com/quote/tsx/TXG/market-cap/
  42. Lundin Gold Inc. (LUG.TO) Research Report | Flash, https://app.stocksentinel.ai/research/LUG.TO
Disclaimer. AI-assisted research for educational purposes — not financial advice. Verify figures with the company’s own filings before making decisions.
← Back to all reports