All eight decks are covered below: every concept, formula, step-by-step method and worked example, with the slide answers checked. Numbers marked "(computed here)" are not on the slides but follow directly from slide data — useful for practising.
| Lecture | Topic | Must-know tools |
|---|---|---|
| 1.2 | Forecasting | Naive, mean, MA, WMA, exponential smoothing, trend-adjusted ES, seasonal indices, regression, r / r², CFE, MAD, MSE, TS |
| 2 | Clustering | Euclidean distance, centroid, SSE, k-means, hierarchical (single/complete/average/mean/Ward), Lance–Williams, precision/recall/accuracy |
| 3 & 4 | Classification | Mean vector, covariance matrix, bivariate normal, conditional probability, total probability, Bayes, full Bayes vs Naive Bayes, pseudo-counts |
| 5 | Advanced inventory | Continuous vs periodic review, EOQ, reorder point, resource-constrained multi-item EOQ, EPQ, safety stock, periodic (TI) system, newsvendor |
| 7 | Mathematical modelling | LP vs ILP, knapsack, multi-knapsack, feasibility, big-M, fixed-charge cost, linking constraints, bin packing with time |
| 8 | Classical models | Set covering, set partitioning, assignment, shortest path (flow formulation), Dijkstra, single-machine scheduling |
| 9 | Logistics costs | Cumulative curves, headways, rent/waiting/holding cost, transport cost cf + cv·v, EOQ with vmax, handling/motion cost, stochastic effects |
| 10 | One-to-one distribution | EOQ robustness, lot sizing with variable demand (two special cases), continuous approximation (lot sizing, terminal location) |
L1.2 — Forecasting (Reid & Sanders ch. 8)
Forecasting predicts future values (demand, capacity, transport times, external factors like population or income) from past data; in logistics it sizes production/transport capacity, inventory, maintenance and the offer.
Principles
- Forecasts are rarely perfect (stochasticity).
- Forecasts rely on data.
- More accurate for grouped data than for individual items.
- More accurate for shorter than longer horizons (temperature plot: next-day forecast tracks actuals best, 10-day worst).
Five steps: decide what to forecast → evaluate appropriate data → select and test model → generate forecast → monitor accuracy and change model if needed.
Types of methods
- Qualitative (subjective): executive opinion, market research, Delphi method (panel of experts).
- Quantitative (formulas): time series (future follows past patterns; all info is in the history) and causal models (cause-and-effect with leading indicators, e.g. regression).
Time series = pattern + random variation. Patterns: level (horizontal around mean), trend (increasing/decreasing), seasonality (regular repeat within a year), cycle (like seasonal but longer horizon, start/end hard to predict). Random variation cannot be forecast.
Level models
\text{Naive: } F_{t+1} = A_t
\text{Simple mean: } F_{t+1} = \frac{\sum_t A_t}{n}
\text{Moving average: } F_{t+1} = \frac{1}{k}\sum_{i=t-k+1}^{t} A_i
\text{Weighted MA: } F_{t+1} = \sum C_t A_t, \quad \sum C_t = 1
\text{Exponential smoothing: } F_{t+1} = \alpha A_t + (1-\alpha) F_t, \quad 0 \le \alpha \le 1
- Naive and simple mean suit level patterns.
- MA drops the oldest and adds the newest point; more responsive to trends than the mean. WMA puts more weight on recent data, so it reacts faster than MA.
- ES needs only last forecast, last actual and α — very popular. No previous forecast? Use the naive one. Higher α = more weight on the last period (and on its random noise); lower α = smoother.
Worked problem (actuals 300, 315, 290, 345, 320, 360, 375 for periods 1–7):
| Method | F7 | F8 |
|---|---|---|
| 2-period MA | (320+360)/2 = 340 | (360+375)/2 = 367.5 |
| 4-period MA | (290+345+320+360)/4 = 328.75 | (345+320+360+375)/4 = 350 |
| 2-period WMA (0.6 on t−1, 0.4 on t−2) | 0.6·360 + 0.4·320 = 344 | 0.6·375 + 0.4·360 = 369 |
| ES, α = 0.2, F6 = 375 | 0.2·360 + 0.8·375 = 372 | 0.2·375 + 0.8·372 = 372.6 |
(Table computed here.) The slide's ES comparison starts from F2 = 300 (naive): α = 0.2 gives 303, 300, 309, 311, 321, 332 for periods 3–8; α = 0.9 gives 314, 292, 340, 322, 356, 373 — high α follows the actuals closely, low α lags.
Trend-adjusted exponential smoothing
Corrects the lag a level model shows on a trend. Three steps:
S_t = \alpha A_t + (1-\alpha)(S_{t-1} + T_{t-1})
T_t = \beta (S_t - S_{t-1}) + (1-\beta) T_{t-1}
FIT_{t+1} = S_t + T_t
Example (lawn care): A_July = 62, previous level S = 57, trend T = 15, α = 0.2, β = 0.1. S_July = 0.2·62 + 0.8·(57+15) = 70; T_July = 0.1·(70−57) + 0.9·15 = 14.8; FIT_August = 70 + 14.8 = 84.8 gallons.
Seasonality (seasonal indices)
- Average demand per season for each year = yearly total / number of seasons.
- Seasonal index per year per season = season demand / that year's average.
- Average the indices per season over the years.
- Forecast next year's total (any method) and divide by number of seasons.
- Season forecast = new average × average index.
TU Delft enrollment example (forecast total 90,000 → average 22,500):
| Quarter | 2021 (avg 20,000) | Index | 2022 (avg 21,000) | Index | Avg index | Year 3 |
|---|---|---|---|---|---|---|
| Fall | 24,000 | 1.20 | 26,000 | 1.238 | 1.22 | 27,450 |
| Winter | 23,000 | 1.15 | 22,000 | 1.05 | 1.10 | 24,750 |
| Spring | 19,000 | 0.95 | 19,000 | 0.905 | 0.93 | 20,925 |
| Summer | 14,000 | 0.70 | 17,000 | 0.81 | 0.75 | 16,875 |
(Spring and Summer computed here; the four forecasts sum to 90,000.)
Causal model: linear regression
y = a + bx with x independent, y dependent.
b = \frac{\sum XY - n\bar{X}\bar{Y}}{\sum X^2 - n\bar{X}^2}, \qquad a = \bar{Y} - b\bar{X}
Goodness of fit
r = \frac{n\sum XY - \sum X \sum Y}{\sqrt{n\sum X^2 - (\sum X)^2}\,\sqrt{n\sum Y^2 - (\sum Y)^2}}
- r = correlation coefficient: direction and strength of the linear relation (closer to ±1 = better fit).
- r² = coefficient of determination: share of variation in y around its mean explained by the line (close to 1 desired).
- Slide example: n = 4, ΣX = 189, ΣY = 589, ΣXY = 28,202, ΣX² = 9,253, ΣY² = 87,165 → r = 0.982, r² = 0.964. (Computed here from the same data: b ≈ 1.152, a ≈ 92.8.)
Forecast error and accuracy
E_t = A_t − F_t. Over-forecast → negative error; under-forecast → positive error.
CFE = \sum_t E_t \qquad MAD = \frac{\sum_t |E_t|}{n} \qquad MSE = \frac{\sum_t E_t^2}{n} \qquad TS = \frac{CFE}{MAD}
- CFE measures bias; MAD total error regardless of sign; MSE penalizes large errors; TS controls bias (large |TS| = biased forecast).
- Example (Jan–May): Method A errors 2, 1, 0, −1, 1 → CFE 3, MAD 1, MSE 1.4. Method B errors 3, 1, 3, 2, 2 → CFE 11, MAD 2.2 (slide rounds to 2), MSE 5.4. Method A is better on every measure.
Selecting a model
Consider: amount and type of data available; degree of accuracy required (more accuracy = more data); length of horizon (3 months vs 10 years need different models); data patterns present (a level model on a trend lags). Other methods: machine learning, combining forecasts (often more accurate), CPFR (Collaborative Planning, Forecasting and Replenishment between buyers and sellers).
L2 — Clustering (Zaki & Meira ch. 13–14)
Clustering partitions n items into K groups that are as homogeneous as possible, i.e. members are close in distance. Key choices: the number of clusters and which features to use. In logistics it serves organisation and consolidation (containers, warehouse slotting, store layout, networks).
Notation and distances
- Data matrix D is n × d: each row x_i is an element, each column X_j an attribute. A vector is written vertically; the row form is its transpose (T).
- Dot product aᵀb = Σ a_i b_i (vectors of the same size).
\|a\| = \sqrt{a^T a} = \sqrt{\sum_i a_i^2} \qquad \delta(a,b) = \|a-b\| = \sqrt{\sum_i (a_i-b_i)^2}
Centroid of cluster C_i (its representative point):
\mu_i = \frac{1}{n_i}\sum_{x_j \in C_i} x_j
Objective — sum of squared errors (to minimize):
SSE(\mathcal{C}) = \sum_{i=1}^{k}\sum_{x_j \in C_i} \|x_j - \mu_i\|^2
Why algorithms? Enumerating all K-partitions is impossible; the count is the Stirling number of the second kind, order k^n / k!:
S(n,k) = \frac{1}{k!}\sum_{t=0}^{k}(-1)^t \binom{k}{t}(k-t)^n
For k = 3 the slide table grows from about 9,800 (n = 10) to about 3·10^14 (n = 32). Both algorithms below are greedy (myopic: take the best nearby option), so they do not guarantee the optimum. An algorithm = steps that build a solution and stop after a fixed number of steps or when a condition holds.
K-means
- Step 0: generate k initial centroids at random (uniform).
- Step 1 (assignment): put each point in the cluster of the nearest centroid: j* = argmin_i ‖x_j − μ_i‖².
- Step 2 (update): recompute each centroid as the mean of its points.
- Step 3: stop if the stopping criterion holds, else go to Step 1. Criteria: assignments no longer change, or Σ‖μ_i^t − μ_i^{t−1}‖² ≤ ε.
1-D slide example, data {2, 3, 4, 10, 11, 12, 20, 25, 30}, k = 2, start μ1 = 2, μ2 = 4:
| Iteration | C1 | C2 | New μ1 | New μ2 |
|---|---|---|---|---|
| 1 | {2, 3} | {4, 10, 11, 12, 20, 25, 30} | 2.5 | 16 |
| 2 | {2, 3, 4} | {10, 11, 12, 20, 25, 30} | 3 | 18 |
| 3 | {2, 3, 4, 10} | {11, 12, 20, 25, 30} | 4.75 | 19.6 |
| 4 | {2, 3, 4, 10, 11, 12} | {20, 25, 30} | 7 | 25 |
| 5 | unchanged → stop | 7 | 25 |
Tip: in 1-D, a point goes to C1 if it lies below the midpoint (μ1+μ2)/2.
Hierarchical (agglomerative) clustering
Starts with n singleton clusters and repeatedly merges the closest pair until one cluster remains (or k clusters). The result is a rooted binary tree, the dendrogram (leaves = items, root = everything). Consecutive clusterings are nested, C_{t−1} ⊂ C_t: A = {A1..Ar} is nested in B = {B1..Bs} if r > s and every A_i lies inside some B_j.
- Step 0: n clusters, compute the distance matrix.
- Step 1: find the closest pair C_i, C_j and merge: C_ij = C_i ∪ C_j.
- Step 2: update C = (C \ {C_i, C_j}) ∪ C_ij.
- Step 3: stop when k clusters (or one) remain; else update the distance matrix and repeat.
Cluster distances (linkage)
| Measure | δ(C_i, C_j) = |
|---|---|
| Single link | min distance between a point in C_i and one in C_j |
| Complete link | max distance between a point in C_i and one in C_j |
| Group average | Σ_x Σ_y δ(x,y) / (n_i · n_j) |
| Mean distance | δ(μ_i, μ_j), distance between centroids |
| Ward (min variance) | increase in SSE when merged = (n_i n_j / (n_i+n_j)) ‖μ_i − μ_j‖² |
Lance–Williams update for the distance of merged C_ij to another cluster C_r:
\delta(C_{ij},C_r) = \alpha_i\,\delta(C_i,C_r) + \alpha_j\,\delta(C_j,C_r) + \beta\,\delta(C_i,C_j) + \gamma\,|\delta(C_i,C_r) - \delta(C_j,C_r)|
| Measure | α_i | α_j | β | γ |
|---|---|---|---|---|
| Single link | 1/2 | 1/2 | 0 | −1/2 |
| Complete link | 1/2 | 1/2 | 0 | 1/2 |
| Group average | n_i/(n_i+n_j) | n_j/(n_i+n_j) | 0 | 0 |
| Mean distance | n_i/(n_i+n_j) | n_j/(n_i+n_j) | −n_i n_j/(n_i+n_j)² | 0 |
| Ward | (n_i+n_r)/(n_i+n_j+n_r) | (n_j+n_r)/(n_i+n_j+n_r) | −n_r/(n_i+n_j+n_r) | 0 |
Check: single link gives ½a + ½b − ½|a−b| = min(a,b); complete link gives max(a,b).
Single-link example (A–B 1, A–C 3, A–D 2, A–E 4, B–C 3, B–D 2, B–E 3, C–D 1, C–E 3, D–E 5): merge AB at 1 → AB–C 3, AB–D 2, AB–E 3; merge CD at 1 → AB–CD 2, CD–E 3; merge ABCD at 2; merge with E at 3 → ABCDE.
Group-average Lance–Williams example: merge [x1,x2,x3] (n=3) and [x5,x7] (n=2) at distance 1; distance to [x4,x6] = (3/5)·3 + (2/5)·2 = 2.6.
Evaluating clusters with labelled data (supervised)
With known classes (e.g. Iris: setosa, versicolor, virginica; 150 flowers, 4 attributes) you know k and can compare clusters to the true classes. Each cluster is matched to the class it holds most of.
- Positive = the reference class; negative = all others.
- TP = item of the class put in its cluster; TN = other-class item correctly outside; FP = other-class item in the cluster; FN = class item outside the cluster.
\text{Accuracy} = \frac{TP+TN}{P+N} \qquad \text{Precision} = \frac{TP}{TP+FP} \qquad \text{Recall} = \frac{TP}{P}
- Slide example (6 points, C1 = 2 setosa + 1 versicolor, C2 = 1 setosa + 2 versicolor, positive = setosa): TP 2, TN 2, FP 1, FN 1 → accuracy 4/6 = 0.67, precision 2/3, recall 2/3 (computed here).
- Iris contingency table (computed here): C1 = 50 setosa → precision 1, recall 1; C2 = 36 versicolor + 1 virginica → versicolor precision 36/37 = 0.97, recall 36/50 = 0.72; C3 = 49 virginica + 14 versicolor → virginica precision 49/63 = 0.78, recall 49/50 = 0.98.
Large data sets are clustered in software, e.g. KNIME Analytics Platform.
L3 & L4 — Classification (Zaki & Meira ch. 2, 3, 18)
Classification predicts the class of a new point, given a data set whose points already have classes. Logistics uses: warehouse/inventory (affinity with already clustered products), bundling freight and allocating new cargo to bundles, trash management, classifying a new product to minimize setup times. Other uses: medicine (prognosis), biology.
Probabilistic approach (4 steps): 1) select attributes from a data set with defined classes; 2) fit a probability distribution per class; 3) compute the probability that the item's attributes are produced by each distribution; 4) assign the item to the class with the highest probability.
Bivariate statistics
- Centered data matrix Z = D − 1·μᵀ (subtract each column's mean). Slide example: D = [2 3; 5 4; 2 5], μ = [3 4] → Z = [−1 −1; 2 0; −1 1].
- Attributes are assumed i.i.d.; bivariate analysis finds a joint distribution for both attributes (ideally both normal → bell shape).
- Mean vector μ = (μ1, μ2)ᵀ. Variance σ_j² = (1/n)Σ(x_ij − μ_j)²; total variance = σ1² + σ2².
- Covariance σ12 = (1/n)Σ(x_i1 − μ1)(x_i2 − μ2): how the two variables vary together.
- Correlation ρ12 = σ12 / (σ1 σ2).
\Sigma = E[(X-\mu)(X-\mu)^T] = \frac{1}{n} Z^T Z = \begin{pmatrix} \sigma_1^2 & \sigma_{12} \\ \sigma_{21} & \sigma_2^2 \end{pmatrix}, \quad \sigma_{12} = \sigma_{21}
(For the slide's D, computed here: Σ = (1/3)[6 1; 1 2] = [2 0.333; 0.333 0.667].) The slides use 1/n, not 1/(n−1).
Multivariate (bivariate, d = 2) normal density:
f(x \mid \mu, \Sigma) = \frac{1}{(\sqrt{2\pi})^d \sqrt{|\Sigma|}} \exp\left\{ -\frac{(x-\mu)^T \Sigma^{-1} (x-\mu)}{2} \right\}
\det\begin{pmatrix} a & b \\ c & d \end{pmatrix} = ad - bc, \qquad \begin{pmatrix} a & b \\ c & d \end{pmatrix}^{-1} = \frac{1}{ad-bc}\begin{pmatrix} d & -b \\ -c & a \end{pmatrix}
One-dimensional version: f(x) = (1/√(2πσ²)) · exp(−(x−μ)² / (2σ²)).
Probability theory
- Axioms: P(A) ≥ 0; P(S) = 1; P(A ∪ B) = P(A) + P(B) for disjoint A, B.
- Conditional probability: P(A|B) = P(AB) / P(B) (A restricted to the new space B). Disjoint → P(A|B) = 0; A ⊂ B → P(A|B) = P(A)/P(B) ≥ P(A); B ⊂ A (AB = B) → P(A|B) = 1; independent → P(A|B) = P(A).
- Dice example: A = sum > 8 (P = 10/36), B = first die is 6 (P = 1/6), P(AB) = 4/36 → P(A|B) = (4/36)/(1/6) = 0.67.
- Law of total probability (A1…Am partition S): P(B) = Σ P(A_i) P(B|A_i).
- Bayes' theorem (P(A_i) = prior, P(B|A_i) = likelihood, P(A_i|B) = posterior):
P(A_i \mid B) = \frac{P(B \mid A_i)\,P(A_i)}{\sum_j P(B \mid A_j)\,P(A_j)}
Doctor example: P(E|H1) = 0.9, P(E|H2) = 0.1, P(E|H3) = 0.3; priors 0.03, 0.7, 0.27. Products 0.027, 0.07, 0.081, sum 0.178 → P(H1|E) = 0.15, P(H2|E) = 0.39, P(H3|E) = 0.45 (most likely).
Full Bayes classifier
\hat{y} = \arg\max_{c_i} \frac{P(x \mid c_i) P(c_i)}{P(x)} = \arg\max_{c_i} f_i(x)\,P(c_i)
P(x) is the same for every class, so skip it. Prior P(c_i) = n_i / n.
Algorithm (numeric attributes): for each class i: 1) filter D for class c_i; 2) prior = n_i/n; 3) likelihood = bivariate normal density f_i(x) with that class's μ_i and Σ_i; 4) store likelihood × prior; 5) after the last class, choose the largest.
Numeric example — classify x = (6.75, 4.25); C1 = (5,9), (6,10), (5,6), (8,25); C2 = (8,6), (10,20), (9,10), (7,4). Slide results are in a Brightspace Excel file; values below computed here with the slides' 1/n covariance:
| C1 | C2 | |
|---|---|---|
| Prior | 4/8 = 0.5 | 4/8 = 0.5 |
| μ | (6, 12.5) | (8.5, 10) |
| Σ | [1.5 8.75; 8.75 54.25] | [1.25 6.5; 6.5 38] |
| abs(Σ) (determinant) | 4.8125 | 5.25 |
| f(x) | ≈ 9.8 · 10⁻¹³ | ≈ 0.00536 |
| f · prior | ≈ 4.9 · 10⁻¹³ | ≈ 0.00268 → C2 |
Categorical attributes
Same formula and prior; the likelihood = (number of class-c_i items with exactly x's combination) / n_ci.
Pseudo-count when the combination never occurs in c_i (m_j = number of possible values of attribute j):
\text{Full Bayes: } P(x \mid c_i) = \frac{1}{n_{c_i} + \prod_{j=1}^{d} m_j} \qquad \text{Naive Bayes: } P(x_j \mid c_i) = \frac{1}{n_{c_i} + m_j}
Data set (C1: long-heavy, short-light, short-light, long-heavy, long-light; C2: short-light, short-heavy, long-heavy):
| New item | C1 score | C2 score | Class |
|---|---|---|---|
| short, light | 5/8 · 2/5 = 0.25 | 3/8 · 1/3 = 0.125 | C1 |
| short, heavy (pseudo-count for C1) | 5/8 · 1/(5+2·2) = 0.069 | 3/8 · 1/3 = 0.125 | C2 |
Naive Bayes
Assumes all attributes are independent → covariances = 0, Σ is diagonal. Likelihood = product of one-dimensional likelihoods per attribute (1-D normal for numbers, per-attribute frequency for categories):
P(x \mid c_i) = \prod_{j=1}^{d} P(x_j \mid c_i)
| New item (data set) | C1 score | C2 score | Class |
|---|---|---|---|
| short, heavy (as above) | 5/8 · 2/5 · 2/5 = 0.10 | 3/8 · 2/3 · 2/3 = 0.167 | C2 |
| long, heavy (C2 = short-light, short-heavy, short-heavy) | 5/8 · 3/5 · 2/5 = 0.15 | 3/8 · 1/(3+2) · 2/3 = 0.05 | C1 |
(Final scores computed here; the slides give the factors.)
Exam-style categorical example (last slide)
Class c1 has 50 items, c2 has 100 → priors 1/3 and 2/3. X1 ∈ {very short, short, long, very long} (m1 = 4), X2 ∈ {short, medium, long} (m2 = 3).
| c1 counts (/50) | X2 short | medium | long | X1 total |
|---|---|---|---|---|
| very short | 1 | 33 | 5 | 39 |
| short | 0 | 3 | 8 | 11 |
| long | 0 | 0 | 0 | 0 |
| very long | 0 | 0 | 0 | 0 |
| X2 total | 1 | 36 | 13 |
| c2 counts (/100) | X2 short | medium | long | X1 total |
|---|---|---|---|---|
| very short | 6 | 0 | 0 | 6 |
| short | 24 | 15 | 0 | 39 |
| long | 13 | 30 | 0 | 43 |
| very long | 3 | 7 | 2 | 12 |
| X2 total | 46 | 52 | 2 |
Answers (computed here):
| Point | Full Bayes c1 | Full Bayes c2 | Naive c1 | Naive c2 | Class |
|---|---|---|---|---|---|
| short, medium | 3/50 · 1/3 = 0.020 | 15/100 · 2/3 = 0.100 | 11/50 · 36/50 · 1/3 = 0.053 | 39/100 · 52/100 · 2/3 = 0.135 | c2 (both) |
| long, long | 1/(50+12) · 1/3 = 0.0054 | 1/(100+12) · 2/3 = 0.0060 | 1/(50+4) · 13/50 · 1/3 = 0.0016 | 43/100 · 2/100 · 2/3 = 0.0057 | c2 (both) |
| very short, long | 5/50 · 1/3 = 0.033 | 1/(100+12) · 2/3 = 0.0060 | 39/50 · 13/50 · 1/3 = 0.068 | 6/100 · 2/100 · 2/3 = 0.0008 | c1 (both) |
L5 — Advanced inventory management (Reid & Sanders ch. 12; Nahmias & Olsen ch. 4)
Inventory balances service level (right product, quantity, time) against cost (ordering + holding, while avoiding stockouts). Learning objectives: explain continuous and periodic review policies; apply optimization; illustrate the effect of uncertainty.
Why hold inventory: meet anticipated demand, smooth production, decouple operations, protect against stockouts, economies of scale, hedge against price increases, quantity discounts. Poor management → stockouts (lost sales) or overstock (excess cost); it affects operations, marketing and finance.
Continuous vs periodic review
| Continuous review | Periodic review | |
|---|---|---|
| How | Tracked in real time; order when stock hits the reorder point R | Checked at fixed intervals; order up to a target level TI |
| Order quantity | Fixed (e.g. EOQ) | Variable |
| Time between orders | Variable | Fixed |
| Pros | High responsiveness, lower inventory, quantity discounts possible | Simple, lower monitoring cost, items can be ordered together |
| Cons | Higher system cost (automated tracking, barcodes), items replenished separately | Higher inventory/safety stock to buffer between reviews, stockout risk if demand spikes |
| Best for | High-value or fast-moving items | Lower-value, less critical items, or when grouping orders pays off |
EOQ (Economic Order Quantity)
Assumptions: constant known demand (no safety stock), constant known lead time, no quantity discounts, fixed order/setup cost, all demand met, whole order arrives at once, perfect quality.
TC(Q) = \frac{D}{Q} S + \frac{Q}{2} H \qquad Q^* = \sqrt{\frac{2DS}{H}} \qquad TC(Q^*) = \sqrt{2DSH}
- D = demand (per period), S = ordering/setup cost per order, H = holding cost per unit per period. All costs in the same time unit.
- Small Q: many orders, low holding; large Q: few orders, high holding. At Q*, ordering cost = holding cost.
- Reorder point R = d · L (d = demand rate per time unit, L = lead time in the same unit).
Example: D = 10,000/yr, price €30, H = 20% · 30 = €6, S = €75, L = 5 days, 250 working days. Q* = √(2·10,000·75/6) = 500 units; TC = (10,000/500)·75 + (500/2)·6 = €3,000; d = 10,000/250 = 40/day → R = 200 units.
Resource-constrained multi-item EOQ
\min TC = \sum_{i=1}^{n} \left( \frac{D_i S_i}{Q_i} + \frac{Q_i H_i}{2} \right) \quad \text{s.t.} \quad \sum_{i=1}^{n} c_i Q_i \le C
c_i = cost or space per unit of item i; C = capacity (budget/space).
- Compute each independent EOQ_i = √(2D_iS_i/H_i).
- If Σ c_i EOQ_i ≤ C, the constraint is not binding → Q_i* = EOQ_i.
- Otherwise it binds. Special case c_1/H_1 = c_2/H_2 = … (resource use proportional to holding cost): Q_i* = m · EOQ_i with m = C / Σ c_i EOQ_i.
Why the special case is reasonable: with a budget constraint c_i is the unit cost and H_i = I_i c_i, so c_i/H_i = 1/I_i; equal ratios = same interest rate for all items.
Example (budget €30,000, I = 25%):
| Item | D_i | c_i | S_i | EOQ_i | Q_i* = 0.8372 · EOQ_i |
|---|---|---|---|---|---|
| 1 | 1,850 | 50 | 100 | √(2·1850·100/12.5) = 172 | 144 |
| 2 | 1,150 | 350 | 150 | √(2·1150·150/87.5) = 63 | 52 |
| 3 | 800 | 85 | 50 | √(2·800·50/21.25) = 61 | 51 |
Σ c_i EOQ_i = 50·172 + 350·63 + 85·61 = 35,835 > 30,000 → m = 30,000/35,835 = 0.8372.
EPQ (Economic Production Quantity)
A production run instead of an order; stock builds up gradually at rate p − d during uptime T1 (assume p > d); downtime T2; cycle T = T1 + T2.
T_1 = \frac{Q}{p} \qquad I_{max} = (p-d)T_1 = Q\left(1 - \frac{d}{p}\right) \qquad TC = \frac{D}{Q}S + \frac{I_{max}}{2}H
Q^* = EPQ = \sqrt{\frac{2DS}{H(1 - d/p)}}
EOQ is the special case p → ∞.
Example (chairs): D = 18,000/yr, d = 1,500/month, p = 2,500/month, S = €800, H = €18/yr, 20 days/month, L = 5 days. Q* = √(2·18,000·800 / (18·0.4)) = 2,000; I_max = 2,000·(1 − 1500/2500) = 800; TC = (18,000/2,000)·800 + (800/2)·18 = €14,400; daily demand = 1500/20 = 75 → R = 375.
Safety stock (demand uncertainty)
R = dL + SS \qquad SS = z\,\sigma_{dL}
σ_dL = standard deviation of demand during lead time; z from the normal table for the service level (95% service = 5% risk → z = 1.645; general table values: 90% → 1.28, 97.5% → 1.96, 99% → 2.33).
Periodic review system
Order every RP (review period, can be derived from EOQ, e.g. EOQ/d) up to target inventory TI; order Q = TI − OH (on-hand). Must cover demand over RP + L.
TI = d(RP + L) + SS \qquad SS = z\,\sigma_t \sqrt{RP + L} \qquad Q = TI - OH
σ_t = standard deviation of demand per time interval (σ_{RP+L} = σ_t√(RP+L)).
Example (pharmacy): d = 6,000/week, σ_t = 500, RP = 1 week, L = 3 weeks, 95% → z = 1.645. SS = 1.645·500·√4 = 1,645; TI = 6,000·4 + 1,645 = 25,645; with OH = 19,000 → Q = 6,645 tablets.
Single-period model (newsvendor)
For perishable/seasonal goods: sold at full price in one period only, highly variable demand with a known distribution, salvage value < cost. Balances cost of excess vs cost of shortage. With discrete demand use an expected value (payoff) matrix:
- Order = Demand: payoff = D · (price − cost).
- Order > Demand: payoff = D · (price − cost) − (Order − D) · (cost − salvage).
- Order < Demand: payoff = Order · (price − cost).
T-shirt example: price €20, cost €8, salvage €2; P(demand 80, 90, 100, 110, 120) = 0.2, 0.25, 0.3, 0.15, 0.1.
| Order \ Demand | 80 | 90 | 100 | 110 | 120 | Expected profit |
|---|---|---|---|---|---|---|
| 80 | 960 | 960 | 960 | 960 | 960 | 960 |
| 90 | 900 | 1,080 | 1,080 | 1,080 | 1,080 | 1,044 |
| 100 | 840 | 1,020 | 1,200 | 1,200 | 1,200 | 1,083 |
| 110 | 780 | 960 | 1,140 | 1,320 | 1,320 | 1,068 |
| 120 | 720 | 900 | 1,080 | 1,260 | 1,440 | 1,026 |
Order 100: 0.2·840 + 0.25·1,020 + 0.3·1,200 + 0.15·1,200 + 0.1·1,200 = €1,083.
L7 — Mathematical modelling (Bombelli et al., From theORy to application)
A mathematical (linear) programming model translates a problem — a situation with constraints whose improvement is measurable — into variables, parameters, constraints and an objective. Slide analogy: passing the course = maximize grade with minimum effort, subject to limited time, other courses, scheduling, grade ≥ 6.
Ingredients
- Variables: unknown values to find (e.g. quantity to buy).
- Parameters: known upfront (unit cost, starting inventory).
- Constraints: equalities/inequalities limiting the variables (money, time).
- Objective function: minimize or maximize.
- Linear: only terms αx — no variable × variable, no logs, no square roots.
Standard format: objective function → constraints → domain of the variables (+ list of parameters and variables). Compact form:
\min(\max) \sum_{j=1}^{n} c_j x_j \quad \text{s.t.} \quad \sum_{j=1}^{n} a_{ij} x_j \ (\ge \text{ or } \le) \ b_i \ \ \forall i = 1..m, \qquad x_j \in \ldots \ \forall j
Classification by domain: x ∈ ℝ → linear programming (LP, relatively easy to solve); x ∈ ℕ or ℤ → integer linear programming (ILP, hard); x ∈ {0,1} → binary/integer linear programming. A solution (a vector x) is feasible if it meets all constraints and optimal if it is feasible and the best of all. Solved with algorithms, trial-and-error, or solvers (CPLEX, GUROBI).
LP example — fertilizer
L-fert per ton: 2 A, 1 B, 1 C, revenue €50. H-fert per ton: 1 A, 1 B, 0 C, revenue €15. Stock: 1500 A, 1200 B, 500 C.
\max 50x_1 + 15x_2 \quad \text{s.t.} \quad 2x_1 + x_2 \le 1500, \quad x_1 + x_2 \le 1200, \quad x_1 \le 500, \quad x_i \ge 0
(Optimum computed here: x1 = 500, x2 = 500, revenue €32,500 — chemical A and C are binding, B has 200 spare.)
Knapsack (ILP)
Items i with weight w_i and value v_i, one knapsack of capacity C:
\max \sum_{i \in I} v_i x_i \quad \text{s.t.} \quad \sum_{i \in I} w_i x_i \le C, \quad x_i \in \{0,1\}
Slide illustration: w = (10, 2, 1, 3, 0.25, 1), v = (5, 2, 1, 1, 4, 0), example solution x = (1, 0, 1, 0, 1, 0) → weight 11.25, value 10.
Multi-knapsack
Two or more bins j with capacity C; each item to at most one bin:
\max \sum_{i \in N}\sum_{j} v_i x_{ij} \quad \text{s.t.} \quad \sum_{j} x_{ij} \le 1 \ \forall i, \qquad \sum_{i \in N} w_i x_{ij} \le C \ \forall j, \qquad x_{ij} \in \{0,1\}
Trap: the first slide version omits Σ_j x_ij ≤ 1 ("model is missing something") — then one item can be packed in both bins and its value counted twice.
Feasibility and logical constraints
- x1 + (1−x2) + (1−x3) + x4 = 4 with binary x → only x = (1, 0, 0, 1).
- … ≤ 3 → forbids exactly that one combination.
- x1 + x3 = 1 → exactly one of the two is in the solution (one in, the other out).
Either-or regions F: 2 ≤ x1 ≤ 4, 4 ≤ x2 ≤ 6 and G: 5 ≤ x1 ≤ 8, 2 ≤ x2 ≤ 3. Listing all 8 bounds is wrong — F and G don't overlap, so it is infeasible. Correct: one binary y and big-M:
\begin{aligned}
&x_1 \ge 2 - My, \ x_1 \le 4 + My, \ x_2 \ge 4 - My, \ x_2 \le 6 + My && (F, \text{ active if } y=0)\\
&x_1 \ge 5 - M(1-y), \ x_1 \le 8 + M(1-y), \ x_2 \ge 2 - M(1-y), \ x_2 \le 3 + M(1-y) && (G, \text{ active if } y=1)
\end{aligned}
Check point (3, 6) with M = 1000: all F constraints hold with y = 0; G's hold because they're relaxed by 1000 → y = 0 (F). For multiple regions use one binary per region, y_F + y_G (+ …) = 1, and relax region k by M·(1 − y_k) (the slide writes this with M·y_F etc.).
The big-M construct
Either f(x) ≥ k or f(x) ≤ γ:
f(x_1..x_n) \ge k - M(1 - y_j) \qquad f(x_1..x_n) \le \gamma + M y_j
- M is a large number that disables a constraint; it always comes with a binary variable.
- A ≤ constraint is relaxed toward +M; a ≥ constraint toward −M.
- y = 0 → the second holds and the first is disabled (≥ something far below 0).
Fixed-charge cost (objective ↔ constraints)
Producing x1 costs fixed f plus p per unit: h(x1) = 0 if x1 = 0; f + p·x1 if x1 > 0.
| Attempt | Model | Problem |
|---|---|---|
| 1 | min f + p x1 | Pays f even when x1 = 0 |
| 2 | min fy + p x1, y ∈ {0,1} | Nothing forces y = 1, so f is never paid |
| 3 ✓ | min fy + p x1, x1 ≤ My, y ∈ {0,1} | Correct: linking constraint |
Attempt 3 check: (x1, y) = (0,0) feasible + correct; (>0, 0) infeasible; (0, 1) feasible for the constraints but not for the problem (never optimal because it costs f for nothing); (>0, 1) correct.
Linking variables and parameters
Binary X_ij = 1 if container i goes on train j (or item i in knapsack j).
- Train departs after container is available, only if on board: t_j ≥ a_i − (1 − X_ij)M, or equivalently t_j ≥ a_i X_ij (both work).
- Train departs before due time, only if on board: t_j ≤ d_i + (1 − X_ij)M.
- If deadlines may be exceeded, add slack (delay) variable d̄_i: t_j ≤ d_i + d̄_i + (1 − X_ij)M (and typically penalize d̄_i in the objective).
Bin packing (and with time)
Like multi-knapsack, but all items must be allocated and each used bin has a cost c_j (y_j = 1 if bin j used):
\min \sum_{j \in B} c_j y_j \quad \text{s.t.} \quad \sum_{j \in B} x_{ij} = 1 \ \forall i \in I, \qquad \sum_{i \in I} w_i x_{ij} \le CAP_j\, y_j \ \forall j \in B
The y_j on the right-hand side both caps capacity and forces y_j = 1 when a bin is used (combining multi-knapsack with the fixed-charge idea).
With time (item availability A_i, deadline D_i, bin departure time t_j, travel time T_j):
t_j \ge A_i x_{ij} \ \ \forall i, j \qquad t_j + T_j \le D_i + (1 - x_{ij})M \ \ \forall i, j
(The first version on the slides uses t_j ≤ D_i + (1 − x_ij)M, i.e. departure before deadline; the "visual" version adds travel time so arrival t_j + T_j meets the deadline.)
L8a — Classical mathematical models (Fazi notes ch. 3)
Learning objectives: formulate classical transport/logistics problems as (MI)(I)LPs; formulate an (MI)LP for an unseen problem; apply Dijkstra. Approach for any formulation exercise: write indices/sets → parameters → decision variables → objective → constraints → variable domains.
Coverage (set covering) problem
Demand locations i ∈ N, candidate hospital sites j ∈ S, opening cost c_j, distance d_ij, coverage radius K. Open sites so every location is within K of at least one open site, at minimum cost. x_j = 1 if site j is opened.
Wrong constraint: x_j d_ij ≤ K ∀i, j — if x_j = 1 it forces every location to be within K of that site. Fix with an incidence parameter a_ij = 1 if d_ij ≤ K, else 0:
\min \sum_{j \in S} c_j x_j \quad \text{s.t.} \quad \sum_{j \in S} a_{ij} x_j \ge 1 \ \ \forall i \in N, \qquad x_j \in \{0,1\}
Set partitioning (exact cover): each location covered exactly once → Σ_j a_ij x_j = 1. Every partitioning solution is feasible for covering, not vice versa (smaller feasible space), so for minimization:
OBJ_{covering} \le OBJ_{partitioning}
Assignment problem
Drivers i ∈ N, passengers j ∈ M, cost c_ij; x_ij = 1 if driver i is assigned to passenger j.
\min \sum_{i \in N}\sum_{j \in M} c_{ij} x_{ij} \quad \text{s.t.} \quad \sum_{i \in N} x_{ij} = 1 \ \forall j \in M, \qquad \sum_{j \in M} x_{ij} = 1 \ \forall i \in N, \qquad x_{ij} \in \{0,1\}
A solution is a permutation matrix: exactly one 1 per row (each driver one passenger) and per column (each passenger one driver).
Shortest path problem
Graph G = (V, E), non-negative weights w_ij, source s, target t; x_ij = 1 if edge (i,j) is on the path. Flow-balance formulation:
\min \sum_{(i,j) \in E} w_{ij} x_{ij} \quad \text{s.t.} \quad \sum_{j:(i,j) \in E} x_{ij} - \sum_{j:(j,i) \in E} x_{ji} = \begin{cases} 1 & i = s \\ -1 & i = t \\ 0 & \text{otherwise} \end{cases} \quad \forall i \in V
Out-flow minus in-flow: the source sends one unit, the target absorbs it, every other node passes it on. Applications: navigation (road/rail/air), telecom networks, delivery services. Single-source version: distance from s to every node plus a predecessor tree.
Dijkstra's algorithm (non-negative weights only)
- Mark all nodes unvisited.
- Tentative distance 0 for the source, ∞ for all others.
- Current node = unvisited node with the smallest tentative distance (always the source first).
- For each unvisited neighbour: distance via current node = current distance + edge weight; if smaller, update it and set its predecessor.
- Mark the current node visited (its distance is now final).
- Repeat 3–5 until all nodes are visited.
- Output: shortest distance to every node; read a path backwards via the predecessors.
Slide example — edges A–B 2, A–D 8, B–D 5, B–E 6, D–E 3, D–F 2, E–F 1, E–C 9, F–C 3; source A:
| Step | Current node (dist.) | Updates |
|---|---|---|
| 1 | A (0) | B = 2 (A), D = 8 (A) |
| 2 | B (2) | D = 2+5 = 7 (B), E = 2+6 = 8 (B) |
| 3 | D (7) | F = 7+2 = 9 (D); E via D = 10 > 8, no change |
| 4 | E (8) | C = 8+9 = 17 (E); F via E = 9, not shorter |
| 5 | F (9) | C = 9+3 = 12 (F) |
| 6 | C (12) | done |
Final: A 0, B 2 (A), D 7 (B), E 8 (B), F 9 (D), C 12 (F). Backtrack C ← F ← D ← B ← A: A → B → D → F → C, weight 12.
Exercise 1 — single-machine scheduling
Tasks j ∈ J with processing time p_j and cost w_j per unit of completion time; one task at a time. Variables: start time t_j ≥ 0; y_ij = 1 if task j is before i.
(a) Minimize weighted completion times without overlap. Writing both t_i + p_i ≤ t_j and t_j + p_j ≤ t_i is wrong (both can't hold → infeasible). Use big-M either-or:
\min \sum_{j \in J} w_j (t_j + p_j) \quad \text{s.t.} \quad t_i + p_i \le t_j + M y_{ij}, \quad t_j + p_j \le t_i + M(1 - y_{ij}) \quad \forall i < j
(b) Due dates d_j and a fixed penalty z_j if late (regardless of delay); x_j = 1 if task j is late:
\min \sum_{j} w_j (t_j + p_j) + \sum_{j} z_j x_j \quad \text{add:} \quad t_j + p_j \le d_j + M x_j \ \ \forall j, \quad x_j \in \{0,1\}
L9 — Succinct models and logistics costs (Daganzo ch. 1–2)
Learning objectives: understand the difference between analytical and mathematical models; analyze logistics system costs with closed formulas.
Mathematical vs analytical models
| Mathematical models (LP/ILP) | Analytical models (closed formulas, e.g. EOQ) | |
|---|---|---|
| Pros | Extensive description of system dynamics; comprehensive single pieces of information | Rough description of a few dynamics, meaningful results; data summaries, less prone to errors |
| Cons | Difficult to solve (need software); detailed data hard to get accurate | May not give many details; data selection needed |
Analytical models write each cost component as a formula and find the best value via derivatives.
Logistics cost categories
- Motion costs (movement): transportation, handling.
- Holding costs (time): rent (storage space), waiting (delay of items, e.g. capital interest).
First model and cumulative diagrams
One production site → transport → one destination; production rate D' = consumption rate; the company decides how much to accumulate before shipping. Four cumulative curves over time: (i) production (slope D'), (ii) shipments (steps), (iii) arrivals (steps, shifted by travel time t_m), (iv) consumption. Headways H_i = times between shipments.
In-class exercise — at time t1 read the diagram as:
- Vertical gap production − shipments = items waiting for transport.
- Vertical gap shipments − arrivals = items in transit.
- Vertical gap arrivals − consumption = items waiting for consumption.
- Horizontal gap production → consumption = waiting time of an item.
Holding costs
\overline{Wait} = H_1 + t_m, \quad H_1 = \max_i H_i \qquad \text{Max accumulation} = D' H_1
\text{rent/year} = c_r \cdot D' H_1 \qquad \text{rent/item} = \frac{c_r \cdot D' H_1}{D'} = c_r H_1
Rent is proportional to the maximum number of items stored (= space needed), so it grows with the maximum headway.
Example BiB: D' = 400/day, c_r = €0.1, H = {10, 12, 8, 15, 14, 12, 16, 10} → H1 = 16; max accumulation = 6,400; rent = 0.1 · 6,400 = €640/year; per item 640/400 = €1.6.
Waiting cost (c_i = cost per item per unit time of delay):
\text{wait/year} = c_i D'(H_1 + t_m) = c_i D' H_1 + c_i D' t_m \qquad \text{wait/item} = c_i H_1 + c_i t_m
- c_i H1 = stationary inventory cost; c_i t_m = pipeline (in-transit) inventory cost.
- If inventory at the destination can be ignored (passengers), the slide's average wait is t_m + ½(H̄·0.5 + H1·0.5).
Transportation costs
\text{shipment cost} \approx c_f + c_v v \qquad \text{cost for } n \text{ shipments} = \sum_{i=1}^{n}(c_f + c_v v_i) = c_f n + c_v V, \quad V = \sum_i v_i
v = shipment size, c_f = fixed cost per shipment, c_v = rate per item. For fixed V, total cost depends only on the number of shipments n.
\text{transport/item} = c_f \frac{n}{V} + c_v = \frac{c_f}{\bar{v}} + c_v = \frac{c_f}{D' \bar{H}} + c_v \quad (\bar{v} = D'\bar{H})
Key contrast: transport cost per item falls with the average headway; holding cost rises with the maximum headway — so regular (equal) headways are best.
Distance-dependent version: c_f = c_s + c_d d and c_v = c'_s + c'_d d:
\text{cost for } n \text{ shipments} = c_s n + c_d n d + c'_s V + c'_d V d
c_s = cost per trip/stop, c_d = cost per vehicle-km, c'_s = extra cost per item carried (loading/unloading), c'_d = cost per item-km. With n_s delivery stops per trip: ≈ c_s(1 + n_s)n + c_d n d + c'_s V.
Example TraLog (Delft → Amsterdam): d = 70 km, capacity 200, V = 600/day → n = 3; c_s = 75, c_d = 1, c'_s = 0.2, c'_d = 0.001. Cost = 75·3 + 1·3·70 + 0.2·600 + 0.001·600·70 = 225 + 210 + 120 + 42 = €597; per item €0.995.
Size quiz: the per-shipment cost f_t(v) satisfies (a) f_t(x1 + x2) ≤ f_t(x1) + f_t(x2) (subadditive: one combined shipment pays the fixed cost once).
Optimal shipment size (EOQ with capacity)
Cost per item = holding (∝ v, since H = v/D') + transport c_f/v (+ c_v constant):
\min_v \ A v + \frac{B}{v} \ \ \text{s.t. } v \le v_{max}, \qquad A = \frac{c_h}{D'}, \ B = c_f, \ c_h = c_r + c_i \qquad v^* = \min\left\{\sqrt{B/A}, \ v_{max}\right\}
Example Star (Amsterdam → Bremen, 355 km, 4h20 = 260 min = 0.542 working day of 8 h): price €25, D' = 2,000/day, v_max = 250, c_f = €75, c_v = €2, c_r = €0.5/week = €26/year, c_i = 2% · 25 = €0.5/unit/year → c_h = €26.5. Slide: A = 26.5/2000 = 0.01325, v* = min{√(75/0.01325), 250} = min{75.2, 250} = 75.2 (graph: motion cost per item falls, holding rises; optimum at 75.2).
Units trap (checked here): the slide divides a per-year holding cost by a per-day demand. With consistent units (D' = 730,000/year) √(B/A) ≈ 1,437 > 250, so v* = v_max = 250. Know the slide's method; always state your units.
Motion costs (transport + handling)
Handling adds a fixed part c'_f per handling unit (capacity v'_max) and c'_v per item; the step function is approximated by the line PQ:
f_m(v) \approx c_f + \left(c_v + c'_v + \frac{c'f}{v'{max}}\right) v \qquad c''_f = c_f, \quad c''_v = c_v + c'_v + c'f / v'{max}
So handling is folded into the transport function. Motion cost per item f_m(v)/v falls with v (sawtooth, lower bound from Eq. 2.7); holding cost per item rises with v.
Stochastic effects
- So far travel time and production/consumption rates were constant. If stochastic: thanks to EOQ robustness, lot size and dispatch frequency should not change.
- Order strategy: when on-hand + backordered items = v0 (reorder point), request a shipment of size v.
- Demand: rate D', standard deviation γ; lead time T_ℓ with mean t_ℓ, s.d. σ_ℓ. Items at destination when the shipment arrives = v0 + v − PQ (PQ = demand during lead time):
E(PQ) = D' t_\ell \qquad var(PQ) = D'^2 \sigma_\ell^2 + D' \gamma t_\ell
- Optimal v: balance motion and inventory cost. Long run: motion cost is the same with or without randomness (same number of shipments); holding costs are larger with stochastic effects.
- Safety stock: R = dL + SS, SS = z σ_dL. Order-cycle service level = probability that demand during lead time does not exceed on-hand inventory; 95% (5% stockout risk) → z = 1.645. Slide graph: Q = 400, SS = 50, R = 250.
L10 — One-to-one distribution (Daganzo ch. 3)
Learning objectives: explain EOQ robustness; analyze lot sizing with variable demand (two special cases); explain continuous approximation (CA); apply CA to lot sizing and freight terminal location.
Lot sizing with constant demand (recap)
D' = demand rate, c_f = setup/transport cost, c_h = holding cost per item, v = shipment size.
z = \min_v \left\{ A v + \frac{B}{v} \right\} \text{ s.t. } v \le v_{max}, \qquad A = \frac{c_h}{D'}, \ B = c_f
v^* = \sqrt{B/A}, \quad z^* = 2\sqrt{AB} \ \ (\text{if } v_{max} = \infty) \qquad v^* = \min\left\{\sqrt{B/A}, v_{max}\right\}
At the unconstrained optimum, holding cost = shipping cost. If √(B/A) > v_max it is infeasible → set v* = v_max.
Robustness of EOQ
(a) Decision off by factor γ (v0 = γ v*):
\frac{z_0}{z^*} = \frac{1}{2}\left(\gamma + \frac{1}{\gamma}\right)
γ = 0.8 (20% error in v) → ½(0.8 + 1.25) = 1.025: only 2.5% cost penalty.
(b) Input off by factor δ:
A' = A\delta \Rightarrow v^{*\prime} = v^* \delta^{-1/2} \qquad B' = B\delta \Rightarrow v^{*\prime} = v^* \delta^{1/2}, \quad z^{*\prime} = z^* \delta^{1/2}
You can rough in costs and stay near-optimal.
Example PedLog: B = €100, A = €1.15, transport cost +10% (δ = 1.1). v* = √(100/1.15) = 9.33 → 9.33·√1.1 = 9.78; z* = 2√(100·1.15) = 21.45 → 21.45·√1.1 = 22.48. Both change by ≈ 5% for a 10% input change.
(c) Model error: if the true holding cost z_h(v) stays within a vertical band of width Δ around Av (Av − Δ/2 ≤ z_h(v) ≤ Av + Δ/2), the extra cost cannot exceed Δ/2. The EOQ form is forgiving.
Lot sizing with variable demand
D(t) = cumulative demand from 0 to t, D'(t) = variable demand rate, c_f per vehicle, c_h per item, v_max, horizon t_max. Decide shipment sizes v0 … v_{n−1} and receipt times t0 = 0, t1 … t_{n−1} to minimize shipping + holding cost. Split c_h = c_r (rent) + c_i (waiting/interest).
Special case 1 — rent dominates (c_i ≪ c_r, c_h ≈ c_r). Rent depends on peak inventory, not on when it is held; shipping cost is n·c_f regardless of sizes. So:
- Minimize the largest shipment → make all shipments equal: v0 = … = v_{n−1} = D(t_max)/n.
- Times: choose t_i with D(t_i) = (i/n) D(t_max), i = 0 … n−1 — dispatch barely enough to cover demand until the next shipment.
- Choose n by minimizing cost; it reduces to EOQ with v = D(t_max)/n and average rate D' = D(t_max)/t_max:
\frac{cost}{time} = c_r \frac{D(t_{max})}{n} + c_f \frac{n}{t_{max}} \qquad \frac{cost}{item} = \frac{c_r}{D'} \cdot \frac{D(t_{max})}{n} + c_f \frac{n}{D(t_{max})}
(So v* = √(c_f D'/c_r) and n* ≈ D(t_max)/v*, rounded to an integer — summary computed here.)
Special case 2 — rent negligible (c_i ≫ c_r, c_h ≈ c_i; small but expensive items). Holding cost ∝ item-hours in inventory = shaded area between the arrivals step curve and D(t); no longer depends on n alone.
- Optimality condition: each line P_iP_{i+1} (top of a step to the next) must be parallel to the tangent of D(t) at the receiving time.
- Graphical procedure: 1) choose P1; 2) move across horizontally to T1 on D(t); 3) from P1 draw a line parallel to the tangent to D(t) at T1; 4) draw a vertical line from T1; 5) the intersection is P2; repeat until past t_max. If you don't end exactly at (t_max, D(t_max)), perturb P1 and redo. Insightful but tedious by hand (Exercise P3 asks you to improve an initial feasible solution this way).
Continuous approximation (CA)
CA replaces the search for discrete t_i with a search for a continuous function (e.g. headway H(t)) that then yields the t_i. Benefits: continuous functions are easier to optimize; works for large systems. Requirement: discrete elements vary slowly, D'(t_i) ≈ D'(t_{i+1}).
CA for lot sizing (case 2). Intervals I_i = [t_{i−1}, t_i], headway step function H_s(t) = t_i − t_{i−1} on I_i. Cost per interval = c_f + c_i·area_i with area_i = ½(t_i − t_{i−1})² D'(t'_i). Rewriting as an integral and replacing H_s(t) by a smooth H(t) and D'(t'_i) by D'(t):
cost \approx \int_0^{t_{max}} \left( \frac{c_f}{H(t)} + \frac{c_i H(t)}{2} D'(t) \right) dt
The integrand is an EOQ at every t, so:
H^*(t) = \sqrt{\frac{2 c_f}{c_i D'(t)}} \qquad cost^* \approx \int_0^{t_{max}} \sqrt{2 c_i c_f D'(t)}\, dt \qquad \frac{cost^*}{item} \approx \frac{\int_0^{t_{max}} \sqrt{\frac{2 c_i c_f}{D'(t)}}\, D'(t)\, dt}{\int_0^{t_{max}} D'(t)\, dt}
From H*(t) to real times: plot H*(t); draw a 45° line from t0; draw a horizontal line from a point P1 so that the area under the continuous H*(t) equals the area under the step; t1 is where the horizontal meets the 45° line; repeat from t1 for t2, etc.
CA for freight terminal location (space instead of time)
A line from 0 to d_max (corridor/country); terminals at d1, d2, …; a truck collects at the terminals and hauls to a depot at d̃ ≥ d_max. D(d) = cumulative flow up to d, D'(d) = demand density (items/km), c_s = fixed cost per terminal stop, c'_d = access cost per item-km.
- Line-haul cost = c_s·n_s; access cost = c'_d × item-km travelled to the nearest terminal.
- Same trade-off as EOQ: many stops → low access, high line-haul; few stops → the reverse.
- Terminal i serves the segment between midpoints m_{i−1} and m_i (m_i = (d_i + d_{i+1})/2); spacing s(d_i) = m_i − m_{i−1}. Access item-km in segment i ≈ ¼ s² D'(d_i) (average access distance is s/4).
\text{Total cost} \approx \int_0^{d_{max}} \left( \frac{c_s}{s(d)} + \frac{c'_d\, s(d)}{4} D'(d) \right) dd \qquad s^*(d) = 2\sqrt{\frac{c_s}{c'd D'(d)}} \qquad cost^* \approx \int_0^{d{max}} \sqrt{c_s c'_d D'(d)}\, dd
Denser zones (large D') → terminals closer together. Cost per item = cost* / D(d_max).
Example (FR–BE–NL): c_s = €850, c'_d = €2; cumulative demand 5,000 at 200 km, 15,000 at 400 km, 40,000 at 500 km → D' = 25 (FR), 50 (BE), 250 (NL) items/km.
cost^* \approx \sqrt{850 \cdot 2}\left(200\sqrt{25} + 200\sqrt{50} + 100\sqrt{250}\right) = 41.23 \times 3{,}995.3 \approx 164{,}732.6
(Computed here: optimal spacing s* = 8.2 km in FR, 5.8 km in BE, 2.6 km in NL; cost per item ≈ 164,733/40,000 ≈ €4.12.)
Accuracy of CA
Best when D'(t) or D'(d) varies slowly over one headway/spacing; still good with moderate variation (objective is convex in the local decision); can over- or under-predict in unfavourable cases.
Exam traps and checklist
The errors below are the ones the slides themselves warn about, or that their worked examples make easy.
- Error sign: E = A − F; over-forecasting gives a negative error. CFE shows bias; MAD and MSE do not.
- Exponential smoothing start: with no previous forecast, use the naive one (F2 = A1).
- Trend-adjusted ES: update S first, then T using the new S, then FIT = S + T.
- Seasonal index: divide by that year's average, then average the indices over the years.
- Covariance: the slides use 1/n. The determinant must be computed per class; the C2 likelihood dominates when x lies near C2's points.
- Pseudo-count: full Bayes uses 1/(n_ci + Π m_j); Naive Bayes uses 1/(n_ci + m_j) per attribute. Only apply it when the count is 0.
- Precision vs recall: precision = TP/(TP + FP), the purity of the cluster; recall = TP/P, how much of the class was captured.
- Lance–Williams: check that single link gives the min and complete link gives the max.
- EOQ units: D, H and S must all be on the same time basis. Reorder point R = d · L uses the daily rate if L is in days. In the Star example on the slides, c_h is per year but D' is per day.
- Constrained multi-item EOQ: first check whether Σ c_i EOQ_i ≤ C. Scale by m only if the constraint binds.
- EPQ: the holding term uses I_max = Q(1 − d/p), not Q.
- Periodic review: safety stock covers RP + L (√(RP+L) · σ_t), not only L.
- Newsvendor: build the full payoff matrix and weight each row by the demand probabilities.
- Modelling: list sets, parameters, variables, objective, constraints and domains. Either-or conditions need big-M with a binary variable. Never list two conflicting constraint sets together, as in the F/G regions or the no-overlap scheduling constraints.
- Fixed charge: min fy + p x combined with x ≤ My. Leaving out the linking constraint lets y = 0.
- Multi-knapsack: don't forget Σ_j x_ij ≤ 1. Bin packing uses = 1 together with CAP_j y_j.
- Coverage: a parameter a_ij multiplies x_j, never d_ij · x_j ≤ K. Covering gives a lower-or-equal objective compared with partitioning.
- Dijkstra: take the smallest unvisited tentative distance, update only unvisited neighbours, and record predecessors so you can backtrack the path.
- Cumulative diagrams: vertical distance = number of items; horizontal distance = time.
- Daganzo costs: rent scales with the maximum headway; transport cost per item falls with the average headway. Equal headways are best.
- v = min{√(B/A), v_max}:* always check capacity.
- EOQ robustness: z0/z* = ½(γ + 1/γ). An input changed by a factor δ changes v* and z* by √δ.
- Variable demand: when rent dominates, use equal shipment sizes timed at D(t_i) = (i/n)D(t_max). When rent is negligible, segment P_iP_{i+1} is parallel to the tangent at the receipt time.
- CA formulas: H*(t) = √(2c_f / (c_i D'(t))) for lot sizing; s*(d) = 2√(c_s / (c'_d D'(d))) for terminal location. Note the factor 2 and the ¼ from the average access distance of s/4.